Laserfiche WebLink
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in <br />the Bidding Documents without consideration during the bidding and Contract award process of possible <br />substitute or "or -equal" items. In cases in which the Contract allows the Contractor to request that Engineer <br />authorize the use of a substitute or "or -equal" item of material or equipment, application for such acceptance may <br />not be made to and will not be considered by Engineer until after the Effective Date of the Contract. <br />11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the <br />materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any <br />assumptions regarding the possibility of post -Bid approvals of "or -equal" or substitution requests are made at <br />Bidder's sole risk. <br />ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS <br />12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the <br />performance of the Work if required by the Bidding Documents to do so. If a prospective Bidder objects to <br />retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an <br />Addendum, then the prospective Bidder should refrain from submitting a Bid. <br />12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any <br />Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection. <br />12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit <br />to Owner a list of the Subcontractors or Suppliers. <br />If requested by Owner, such list shall be accompanied by an experience statement with pertinent information <br />regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other <br />individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed <br />Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent <br />Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a <br />substitute, Bidder's Bid price will be increased (or decreased) by the difference in cost occasioned by such <br />substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award. <br />12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next <br />lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining <br />to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any <br />Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written <br />objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to <br />subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions. <br />ARTICLE 13 - PREPARATION OF BID <br />13.01 The Bid Form is included with the Bidding Documents. <br />A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations <br />shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, <br />Bid item, alternate, adjustment unit price item, and unit price item listed therein. <br />B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and <br />Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words "No <br />Bid" or "Not Applicable." <br />13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear <br />under the signature), accompanied by evidence of authority to sign. The corporate address and state of <br />incorporation shall be shown. <br />City of Ramsey - R16.111092 INSTRUCTIONS TO BIDDERS <br />April 5, 2017 PAGE 00200-5 <br />© Bolton & Menk, Inc. 2016, All Rights Reserved <br />