Laserfiche WebLink
policy. Such named insured shall act as fiduciary for the other insureds, and give notice to <br />such other insureds that adjustment and settlement of a claim is in progress. Any other <br />insured may state its position regarding a claim for insured loss in writing within 15 days <br />after notice of such claim. <br />B. Proceeds for such insured losses may be made payable by the insurer either jointly to <br />multiple insureds, or to the named insured that purchased the policy in its own right and as <br />fiduciary for other insureds, subject to the requirements of any applicable mortgage clause. <br />A named insured receiving insurance proceeds under the builder's risk and other policies of <br />insurance required by Paragraph 6.05 shall distribute such proceeds in accordance with <br />such agreement as the parties in interest may reach, or as otherwise required under the <br />dispute resolution provisions of this Contract or applicable Laws and Regulations. <br />C. If no other special agreement is reached, the damaged Work shall be repaired or replaced, <br />the money so received applied on account thereof, and the Work and the cost thereof <br />covered by Change Order, if needed. <br />ARTICLE 7 — CONTRACTOR'S RESPONSIBILITIES <br />7.01 Supervision and Superintendence <br />A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, <br />devoting such attention thereto and applying such skills and expertise as may be necessary <br />to perform the Work in accordance with the Contract Documents. Contractor shall be solely <br />responsible for the means, methods, techniques, sequences, and procedures of <br />construction. <br />B. At all times during the progress of the Work, Contractor shall assign a competent resident <br />superintendent who shall not be replaced without written notice to Owner and Engineer <br />except under extraordinary circumstances. <br />7.02 Labor; Working Hours <br />A. Contractor shall provide competent, suitably qualified personnel to survey and lay out the <br />Work and perform construction as required by the Contract Documents. Contractor shall at <br />all times maintain good discipline and order at the Site. <br />B. Except as otherwise required for the safety or protection of persons or the Work or <br />property at the Site or adjacent thereto, and except as otherwise stated in the Contract <br />Documents, all Work at the Site shall be performed during regular working hours, Monday <br />through Friday. Contractor will not perform Work on a Saturday, Sunday, or any legal <br />holiday. Contractor may perform Work outside regular working hours or on Saturdays, <br />Sundays, or legal holidays only with Owner's written consent, which will not be <br />unreasonably withheld. <br />7.03 Services, Materials, and Equipment <br />A. Unless otherwise specified in the Contract Documents, Contractor shall provide and <br />assume full responsibility for all services, materials, equipment, labor, transportation, <br />construction equipment and machinery, tools, appliances, fuel, power, light, heat, <br />telephone, water, sanitary facilities, temporary facilities, and all other facilities and <br />incidentals necessary for the performance, testing, start up, and completion of the Work, <br />whether or not such items are specifically called for in the Contract Documents. <br />B. All materials and equipment incorporated into the Work shall be of good quality and new, <br />except as otherwise provided in the Contract Documents. All special warranties and <br />EJCDC® C-700, Standard General Conditions of the Construction Contract. <br />Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page 26 of 65 <br />