My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.03.C. The RPR shall not: <br />1. Authorize any deviation from the Contract Documents or substitution of materials or equipment <br />(including "or -equal" items). <br />2. Exceed limitations of Engineer's authority as set forth in the Contract Documents. <br />3. Undertake any of the responsibilities of Contractor, Subcontractors, or Suppliers. <br />4. Advise on, issue directions relative to, or assume control over any aspect of the means, methods, <br />techniques, sequences or procedures of Contractor's work. <br />5. Advise on, issue directions regarding, or assume control over security or safety practices, <br />precautions, and programs in connection with the activities or operations of Owner or <br />Contractor. <br />6. Participate in specialized field or laboratory tests or inspections conducted off -site by others <br />except as specifically authorized by Engineer. <br />7. Accept Shop Drawing or Sample submittals from anyone other than Contractor. <br />8. Authorize Owner to occupy the Project in whole or in part. <br />SC-13.03. UNIT PRICE WORK <br />Delete Paragraph 13.03.E. in its entirety and insert the following in its place: <br />13.03.E. The unit price of an item of Unit Price Work shall be subject to reevaluation and adjustment under the <br />following conditions: <br />1. if the original bid amount of a particular item of Unit Price Work amounts to five (5) percent or <br />more of the total Contract Price and the variation in the quantity of that particular item of Unit <br />Price Work performed by Contractor differs by more than twenty (20) percent from the <br />estimated quantity of such item indicated in the Agreement; and <br />2. if there is no corresponding adjustment with respect to any other item of Work; and <br />3. if Contractor believes that Contractor has incurred additional expense as a result thereof or if <br />Owner believes that the quantity variation entitles Owner to an adjustment in the unit price, <br />either Owner or Contractor may make a Claim for an adjustment in the Contract Price in <br />accordance with Article 10 if the parties are unable to agree as to the effect of any such <br />variations in the quantity of Unit Price Work performed. <br />SC-15.01.B.4 APPLICATIONS FOR PAYMENT <br />Add the following Paragraph 15.01.B.4 immediately after Paragraph 15.01.B.3. <br />15.01.B.4. All out-of-state contractors shall comply with all State of Minnesota surety deposit requirements. The <br />OWNER may withhold an additional sum of 8 percent of the amount due the CONTRACTOR from each payment <br />and forward it to the Department of Revenue until the CONTRACTOR's state tax obligations are considered fulfilled <br />unless the CONTRACTOR can show reason for exemption. Exemption will be granted provided the out-of-state <br />CONTRACTOR meets the exemption guidelines established for the Minnesota Department of Revenue. All <br />necessary forms may be obtained from the Minnesota Department of Revenue, Mail Station 4450, St. Paul, <br />Minnesota 55146-4450, or phone 1-800-657-3777 or online <br />at: http://www.revenue.state.mn.us/businesses/withholding/Pa&es/Forms.aspx <br />SC-15.01.C. REVIEW OF APPLICATIONS <br />Delete Paragraph 15.01.C.1. <br />City of Ramsey - R16.111092 SUPPLEMENTARY CONDITIONS <br />April 5, 2017 PAGE 00800-7 <br />© Bolton & Menk, Inc. 2016, All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.