My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 12 <br />SP 0202-101 <br />otherwise modify the foregoing periods of restrictions as actual traffic conditions may warrant. If the Contractor is <br />negligent in adhering to the established time schedules, he shall be subject to an hourly charge assessed at a <br />rate of $500.00 per hour for each hour or any portion thereof with which the Engineer determines that the <br />Contractor has not complied <br />(C) Unless otherwise approved by the Engineer, any temporary lane closure that is adjacent to traffic, <br />and is extending to or beyond 1000 feet shall have a minimum of one Type III barricade, or three drums, placed in <br />the closed lane for every 1000 feet of extension. Any lane closure that is adjacent to traffic and inplace 3 days or <br />more, shall use the Type III barricade only. <br />(D) All lane closures shall have Drum (Type B) Channelizers with florescent reflectorized sheeting in <br />the lane closure taper and in any shifts in traffic alignment. <br />(E) Short Term Duration lane closures will not be permitted during inclement weather, nor any other <br />time when, in the opinion of the Engineer, the lane closure will be a greater than normal hazard to traffic. <br />When working on the shoulder or median the Contractor shall install the traffic control according <br />to Layout 2 (Work on Shoulder) of the Field Manual. Notes 1 and 2 are deleted on Layout 2. <br />(G) Temporary lane restrictions and/or closures for removing and/or erecting overhead structures are <br />permitted between the hours of 9 A.M. and P.M. as approved by the Engineer. If the Contractor requests to close <br />the road and the Engineer approves that it is necessary to temporarily detour traffic in order to remove or set the <br />structures, the Contractor shall furnish the detour as directed by the Engineer. The temporary detour shall be <br />incidental work. If the Contractor is negligent in adhering to the established time schedules, he shall be <br />subject to an hourly charge assessed at a rate of $1500.00 per hour for each hour or any portion thereof with <br />which the Engineer determines that the Contractor has not complied. <br />The Contractor may stop all traffic on any road open to traffic to erect or remove overhead <br />structures for periods not to exceed fifteen minutes only from 1:30 A.M. to 5:00 A.M. The Contractor shall allow <br />sufficient clearance time between stopped periods to minimize the delay to traffic. If the Contractor is negligent <br />in adhering to the established time schedules, he shall be subject to an hourly charge assessed at a rate of <br />$1500.00 per hour for each hour or any portion thereof with which the Engineer determines that the <br />Contractor has not complied. <br />(H) No center lane closures will be permitted. Only double lane closures as shown in the Field <br />Manual will be allowed at the times as directed by the Engineer. This may require night lane closures if traffic <br />volumes warrant. <br />(I) The Contractor shall maintain a minimum of 1.25 miles [two km] between temporary lane <br />closures, except if allowed by the Engineer. <br />(J) Flashing Arrow Boards <br />The Contractor shall provide one vehicle or trailer mounted flashing arrow board for each lane of <br />each work area where traffic is restricted. The arrow board shall meet the requirements of the MN MUTCD, and be <br />on the Temporary Traffic Control Electronic Equipment Approved/Qualified Products List for "Flashing Arrow <br />Boards" found at: http://www.dot.state.mn.us/products/temporarytrafficcontrol/tccelectronicequipment.html. The <br />flashing arrow board shall be equipped with a light that is visible to personnel in the work area to indicate that the <br />unit is in operation. All costs incurred to provide the flashing arrow board shall be incidental. <br />It is imperative that the Contractor continually operate each Flashing Arrow Board at maximum <br />legibility. Many factors, such as mechanical problems, insufficient charging, incorrect intensity settings, or other <br />factors can degrade performance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.