My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SALT Schedule of Materials Control - Local Government Agency <br />This Schedule of Materials Control (SMC) outlines the minimum testing requirements for State Aid Funded <br />and/or Federal Aid Projects off the National Highway and Trunk Highway System. Optional to this SMC is the <br />MnDOT Materials Control Schedule. Usage of either schedule must be defined in the project proposal. <br />1603.2 SAMPLING AND TESTING - INSERT INTO SPECIAL PROVISIONS <br />The first paragraph is hereby deleted and replaced with the following: <br />Sampling and testing of materials for this project will be in accordance with the State Aid <br />for Local Transportation (SALT) "Schedule of Materials Control — Local Government <br />Agency" (SMC-LGA). The SMC-LGA establishes the size of samples and the minimum rate <br />of testing. The SMC-LGA references the 2016 MnDOT Standard Specifications for <br />Construction and does not set contract requirements for the material. <br />The SMC - LGA serves as a guide for material testing with allowable acceptance "as directed by the <br />Engineer" detailed in Specification 1501.1(1) - Authority of the Engineer. These testing rates are a minimum <br />and additional tests may be taken at the Engineer's discretion. A minimal testing rate does not always ensure <br />a quality product; field observations and attention to detail is crucial. Materials not listed on an approved <br />products list may be sampled and tested as directed by the Engineer. Materials listed on a Qualified Products <br />list may be accepted or tested at the discretion of the Engineer. <br />Federal Aid projects require Independent Assurance Inspection. Contact the MnDOT District IA Inspector <br />when the job starts to provide the proper servicing of your project. <br />Definitions <br />SALT Construction Website <br />MnDOT Office of State Aid for Local Transportation. The SMC - LGA is located at the construction page <br />under "Information & Resources - Manuals". <br />MnDOT Schedule of Materials Control <br />Schedule of Materials Control (SMC) are inserted into project proposals to direct how materials are to be <br />sampled. The SMC is updated yearly. Each SMC is project specific. Therefore, one needs to refer to their <br />specific proposal. <br />Approved Products List <br />Products are"approved" when they have been found to routinely meet all applicable standards and <br />specifications. The product is placed on the list based upon established successful manufacturer's quality <br />control and warranties, but the listing may expire or require periodic renewal to verify the product has not <br />changed over time. The approval process for the individual product should specify any expiration requirement. <br />Qualified Products List <br />Products are predicted to meet all applicable standards and specifications, but random sample testing is <br />required to verify specific product lots meet specifications prior to usage. These products are generally <br />considered to be "qualified" but not approved until tested for compliance. Successfully tested products lots are <br />considered to be "approved". The approval process for the individual product should specify any further <br />testing requirements for the product. <br />Certified Sources <br />Certified Sources must comply with each individual product's defined "certification procedure". Acceptance of <br />products from certified sources follows the same sampling and testing as "qualified" products. <br />Quality assurance (QA) is a process -centered approach to ensuring that the best possible products or <br />services are provided. Related to quality control, quality assurance focuses on enhancing and improving the <br />process that is used to create the end result, rather than focusing on the result itself. Among the parts of the <br />process that are considered in QA are planning, design, development, production and service. <br />Quality control (QC) is a process that is used to ensure a certain level of quality in a product or service. It <br />includes actions deemed necessary to provide for the control and verification of certain characteristics of a <br />product or service. It involves thoroughly examining and testing the quality of products or the results of <br />services. The basic goal of quality control is to ensure that the products or services that are provided meet <br />specific requirements and characteristics. <br />2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.