My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 11/09/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:34:07 PM
Creation date
11/5/2004 2:20:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br />RESOLUTION #04-11-XXX <br />A RESOLUTION AUTHORIZING PREPARATION OF A FEASIBILITY STUDY FOR <br />THE PARKING RAMPS IN RAMSEY TOWN CENTER <br />WHEREAS, the master development agreement for Ramsey Town Center was signed on <br />September 17, 2003 approving the Ramsey Town Center, and; <br />WHEREAS, the development indicated that two parking ramps were to be constructed <br />within the Ramsey Town Center located in Oulot L and Outlots X and S, and; <br />WHEREAS, the developer has been in negotiations with the City of Ramsey to assess <br />certain portions of the parking ramps within the Ramsey Town Center plat, and; <br />WHEREAS, LSA Design has been contracted with to perform a parking analysis that <br />defines the need for these two parking ramps, and; <br />WHEREAS, LSA Design has submitted the attached proposal to prepare a feasibility <br />study for the construction of these two ramps that will indicate the schedule, costs, and payment <br />information; <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />1) The City Administrator is directed to Order Preparation of a Feasibility Study for this project <br />from, LSA Design.. <br />2) The compensation for this Feasibility Study will not exceed $8,500.00 <br />The motion for the adoption of the foregoing resolution was duly seconded by Councilmember <br />and upon vote being taken thereon, the following voted in favor thereof: <br />and the following voted against the same: <br />and the following abstained: <br />and the following were absent: <br />Whereupon said resolution was declared duly passed and adopted by the Ramsey City Council <br />this the day of November 2004. <br />ATTEST: <br />City Clerk <br />Mayor <br />RESOLUTION #04-03-XXX <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.