My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 11/09/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:34:07 PM
Creation date
11/5/2004 2:20:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D E S I G n <br />To: <br />From: <br />Project: <br />Subject: <br />Date: <br />MEMORANDUM <br />Brian Olson <br />Jim Lasher <br />Ramsey Town Center <br />Letter Proposal <br />October 14, 2004 <br />We are pleased to submit this proposal for consulting services necessary to provide a <br />Feasibility Study for West Parking Structure in Ramsey Town Center. <br />PROJECT UNDERSTANDING <br />The City of Ramsey will control ownership of two proposed parking structures within <br />Ramsey Town Center. The final sizing, staging, and financing for the South Parking <br />Structure (capital, operations and maintenance) is currently being determined. The <br />shared parking potential between proposed uses for the parking structure west of <br />downtown has also been calculated. This Feasibility Study will define the parking <br />phasing, size, schedule and construction cost for the West Facility as well as how to <br />finance its construction. <br />SCOPE OF SERVICES <br />The scope of service for the study will include: <br />■ Review and refine the current program elements with the owner and the impacts to <br />the Feasibility Study. <br />■ Establish a design basis for the patrons using the parking structure. <br />■ Prepare site plan documents based on the approved design basis. <br />■ Prepare an implementation schedule. <br />■ Prepare a SD level probable cost of construction. <br />■ Determine use and source of capital financing for the facility. <br />■ Attend City meetings and respond to staff comments and questions. <br />PROFESIONAL COMPENSATION <br />LSA Design will provide these professional services for a lump sum fee of $8,000. <br />In addition to the design fees, reimbursable expenses will be invoiced at 1.1 times the <br />actual cost and shall include such items as transportation, postage, express delivery <br />services, plotting and reproduction of drawings and reports and similar project -related <br />items. We recommend budgeting $500.00 for these costs. <br />Planning I Architecture I Urban.De.sign I Landscape.Architecture <br />LSA DESIGN, INC. 1 250 Third Ave. North, Suite 600 1 Minneapolis, MN 55401 1 612.339.8729 1 Fax: 612.339.7433 1 mail@lsadesigninc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.