My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 11/09/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:34:07 PM
Creation date
11/5/2004 2:20:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0,1 i i <br />COUNTY OF ANOKA <br />Public Services Division <br />HIGHWAY DEPARTMENT <br />1440 BUNKER LAKE BLVD. N.W., ANDOVER, MINNESOTA 55304 <br />(612) 862-4200 FAX (612) 862-4201 <br />August 27, 2004 <br />Amy Geisler <br />Ctty of Ramsey <br />15 ! 53 Noy; hen B1%,d. \f W. <br />Ramsey, MN 55303 <br />RE: Additional Comments - Preliminary Plat <br />Regency Pond 4"' Addition (formerly known as Outlot A of Regency Pond) <br />Dear Amy, <br />Subsequent discussions have been held between local officials, the developer and City and County staff. Anoka County <br />will agree to allowing a direct access point to CR 56 for this site, provided that it also serve as the access point for the <br />remaining parcel zoned E-1 within the inner NW quadrant of the CSAH 116/CR 56 intersection, and that internal <br />connectivity between the two parcels is provided and no other direct access to the county highway system will be <br />necessary or permitted For these parcels. Depending on the magnitude of development to occur in this remaining parcel, <br />NB CR 56 right turn lane construction may be required to be completed in conjunction with the remaining development. <br />Please note that this section of CR 56 will have raised median channelization, and the access point permitted for these <br />parcels onto CR 56 will become right turn in/right turn out (R /RO) at some point in the near fixture. <br />All other comments regarding this development made in previous reviews remain unchanged. Thank you for the <br />opportunity to comment. Feel free to contact me if you have any questions regarding this review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Nlanager <br />Yc: CR 56 + CSAH 116/PLATS/2004 <br />Roger Butler, Traffic Engineering Coordinator <br />Josie Scott, Traffic Engineering Technician <br />"Perri Klein, Permit Technician <br />,Mike Kelly, Chief Right Of Way Agent <br />Larry Floium, County Surveyor <br />Andrew Witter, Construction Engineer <br />Dou1 F ischer, County Engineer <br />Affirmative Action / Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.