Laserfiche WebLink
CITY OF RAMSEY <br />DEVELOPMENT PERMIT <br />TSM DEVELOPMENT, INC. <br />On November 9, 2004, Site Plan approval was granted by the City of Ramsey ("City") to TSM <br />Development, Inc. ("Permittee"), whose address is 222 Monroe Street, Anoka, MN 55303, to construct <br />a 60,440-square-foot mini -storage facility ("Structure") on the property which is legally described as <br />follows: <br />Outlot A, Regency Pond, Anoka County, Minnesota <br />Or upon recording of Regency Pond, 41h Addition: <br />F,ot 1, Block 1, Regency Pond 4'h Addition, Anoka County, Minnesota <br />the ("Site") <br />This approval is issued pursuant to §9.03.06 of the City Code. The conditions of this approval are as <br />follows: <br />1. STRUCTURE. All building plans must be prepared and certified by a registered engineer or <br />architect. <br />2. STATE BUILDING CODE COMPLIANCE. The structure shall be constructed in <br />accordance with the requirements of the State Building Code. <br />3. SITE PLAN COMPLIANCE. The structures shall be constructed on the Site as shown on the <br />Site Plan submittal prepared by James R. Hill, Inc., dated June 8, 2004, revised July 2, 2004, <br />revised August 18, 2004, revised September 20, 2004, revised October 6, 2004, revised <br />October 25, 2004, revised October 29, 2004. <br />4. REQUIRED IMPROVEMENTS. The Permittee shall construct and install the following site <br />improvements on the Site in accordance with the specifications and location as shown on the <br />Site Plan. The Required Improvements are as follows: <br />a. Site grading in accordance with the Grading Plan prepared by James R. Hill, Inc. dated <br />April 29, 2004, revised July 6, 2004, revised August 18, 2004, revised October 6, 2004, <br />revised October 13, 2004, revised October 25, 2004, revised October 29, 2004 and in <br />compliance with City Staff review letter dated June 25, 2004, revised July 9, 2004, revised <br />November 4, 2004. <br />b. Installation of concrete and bituminous driveways and parking lot. <br />c. Installation of storm sewer, sanitary sewer, watermain, and appurtenances. <br />d. Installation of B-6/12 continuous concrete curbing around the perimeter of all concrete <br />and/or bituminous surfaces. <br />e. FFstablishment of turf in areas disturbed during construction and in accordance with the Site <br />Plan. <br />