Laserfiche WebLink
Estimated Costs for the Remedial Excavation without Segregation of Lead Shot <br />St. Anthony Gun Club Site Located in Ramsey, MN <br />Estimated <br />Unit <br />Quantities <br />Unit Price <br />Total <br />1) Excavation, Hauling, & Disposal Activities <br />Mobilization/Demobilization <br />LS <br />1 <br />$8,500.00 <br />$8,500.00 <br />Permits (Erosion control etc.) <br />LS <br />1 <br />$800.00 <br />$800.00 <br />Silt Fencing (Erosion Control) <br />LS <br />1 <br />$14,000.00 <br />$14,000.00 <br />Lead Impacted Soil Excavation, Loading, Hauling, & Disposal <br />C.Y. <br />8,000 <br />$32.90 <br />$263,200.00 <br />(lead stabilization in -place without segregation or screening) <br />PAIL Impacted Soil Excavation, Loading, Hauling, and Disposal <br />C.Y. <br />11,000 <br />$20.51 <br />$225,610.00 <br />Lcad Stabilization <br />C.Y. <br />150 <br />$56.68 <br />$8,502.00 <br />Ilackfill (w/on-site material) <br />C.Y. <br />19,000 <br />$2.78 <br />$52,820.00 <br />Dewatcring Contingency <br />LS <br />1 <br />$6,700.00 <br />$6,700.00 <br />1) Total <br />$580,132.00 <br />2) Engineering Costs <br />Project Management/Coordination <br />hours <br />80 <br />$120.00 <br />$9,600.00 <br />Excavation Oversight (based on 4 weeks) <br />hours <br />200 <br />$80.00 <br />$16,000.00 <br />Equipment, Supplies, & Riembursables <br />LS <br />1 <br />$2,500.00 <br />$2,500.00 <br />Reporting, Report Production, Etc. <br />LS <br />1 <br />$12,500.00 <br />$12,500.00 <br />Misc. <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />3) Total $45,600.00 <br />3) Analytical Services <br />Soil <br />Floor Sampling (PAHs - EPA 8270) <br />sample <br />50 $80.00 <br />$4,000.00 <br />Floor Samples (Lead EPA 6010) <br />sample <br />100 $15.00 <br />$1,500,00 <br />Misc. <br />LS <br />1 $2,000.00 <br />$2,000.00 <br />Groundwater (for discharge purposes) <br />LS <br />1 $500.00 <br />$500.00 <br />4) Total $8,000.00 <br />Estimated Project Total $633,732.00 <br />Notes: +/-25% <br />Tolerance is based on confidence of the above estimates as well as potential project contingencies. <br />Engineering costs are based on Wenck Associates, Inc. estimated times multiplied by staff rates. <br />