Laserfiche WebLink
5. Conclusions and Recommendations <br />The traffic impacts and operation of the proposed Capstone Homes Development were <br />thoroughly studied and the principal findings are: <br />• The proposed expansion is expected to generate approximately 2,912 new trips <br />during an average weekday (1,456 entering and 1,456 exiting), approximately <br />227 new trips during the a.m. peak hour (53 entering and 174 exiting) and <br />approximately 297 new trips during the p.m. peak hour (189 entering and 108 <br />exiting). <br />• The existing study intersections operate with acceptable delays and vehicle <br />queues today with slightly increased queueing and delay at TH 10/Alpine Drive. <br />• The study intersections are expected to operate acceptably during the 2040 no - <br />build and build scenarios with the exception of TH 10/Alpine Drive. <br />• TH 10/Alpine Drive experiences slightly higher than preferred queueing along <br />Alpine Drive, however this is expected at side street stop controlled <br />intersections with heavy mainline volume. <br />• Left turn lanes are not warranted based on the expected 2040 build year <br />volumes and mainline speeds. <br />• Right turn lane warrants are not fulfilled due to the mainline speeds remaining <br />below 45 MPH, which is consistent for neighborhood streets. <br />• There are no safety concerns with regards to turn lanes, due to the low queues, <br />minimal delay, and good sight distance provided at all site accesses <br />The following recommendations are made based on the above findings: <br />• No additional intersection mitigation is required to help improve capacity. <br />However, the TH 10/Alpine Drive intersection should be monitored to determine <br />when volumes breach the Eight -Hour Traffic Signal Warrant as the projected <br />volumes are heavily dependent on a number of anticipated developments that <br />are not guaranteed to occur. <br />• Coordinate TH 10/Alpine Drive improvements with MnDOT once the Eight Hour <br />Warrant is exceeded. <br />• If the speed limits along Puma Street or Alpine Drive are increased to 45 MPH <br />or higher, re-evaluate the Turn -Lane warrants. <br />• Construct a new sidewalk/trail along the southern edge of Alpine Drive <br />connecting the proposed access to the existing Alpine Drive/Puma Street <br />intersection. The addition of a north/south crosswalk should also be considered <br />at this intersection to help promote safe crossing to the existing northern <br />sidewalk/trail. <br />• Ensure the proposed internal sidewalks connect to the external sidewalk/trail <br />system. <br />• Work with Metro Transit or their affiliates to improve transit options within the <br />project area as the closest existing transit is located roughly 1.5 miles away at <br />Ramsey Station and Platform. <br />Traffic Impact Study 13 <br />Capstone Homes Residential Development <br />NSULTIING <br />