Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop Stop Free Free <br />Flared Lane No No <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />d_M, Delay for Movement [s/veh] 8.53 9.04 8.32 8.55 9.05 8.35 7.23 .. 7.22 <br />Movement LOS A A A A A A A A A A A <br />95th-Percentile Queue Length [veh] 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 <br />95th-Percentile Queue Length [ft] 0.00 0.00 0.00 0.37 0.37 0.37 0.00 0.00 0.00 0.00 0.00 <br />d_A, Approach Delay [s/veh] 8.63 8.55 2.41 0.00 <br />Approach LOS A A A A <br />d_I, Intersection Delay [s/veh] 4.27 <br />Intersection LOS A <br />Scenario 2: 2 Existing PM Peak <br />Traffic Impact Study G16 Speck Consulting <br />Capstone Homes Residential Development <br />