Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop Stop Free Free <br />Flared Lane No No <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 0.00 0.00 0.00 0.33 0.00 0.00 0.00 0.00 <br />d_M, Delay for Movement [s/veh] 9.01 10.02 8.32 10.94 11.42 10.64 7.57 .. 7.22 <br />Movement LOS A B A B B B A A A A A <br />95th-Percentile Queue Length [veh] 0.00 0.00 0.00 1.42 1.42 1.42 0.00 0.00 0.00 0.00 0.00 <br />95th-Percentile Queue Length [ft] 0.00 0.00 0.00 35.55 35.55 35.55 0.00 0.00 0.00 0.00 0.00 <br />d_A, Approach Delay [s/veh] 9.12 10.94 2.52 0.00 <br />Approach LOS A B A A <br />d_I, Intersection Delay [s/veh] 6.81 <br />Intersection LOS B <br />Scenario 4: 4 2040 No -Build AM Peak <br />Traffic Impact Study G25 Speck Consulting <br />Capstone Homes Residential Development <br />