Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop <br />Flared Lane <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 2.31 <br />d_M, Delay for Movement [s/veh] 1156.59 <br />Movement LOS F <br />95th-Percentile Queue Length [veh] 4.78 <br />95th-Percentile Queue Length [ft] 119.47 <br />d_A, Approach Delay [s/veh] 323.39 <br />Approach LOS F <br />d_I, Intersection Delay [s/veh] <br />Intersection LOS <br />Free Free <br />0.17 0.06 0.32 <br />13.36 110.63 12.76 <br />B F A A B A <br />0.59 0.17 0.00 0.00 1.40 0.00 <br />14.83 4.24 0.00 0.00 34.97 0.00 <br />0.22 1.16 <br />A A <br />11.55 <br />F <br />Scenario 4: 4 2040 No -Build AM Peak <br />Traffic Impact Study G29 Speck Consulting <br />Capstone Homes Residential Development <br />