Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop Stop Free Free <br />Flared Lane No No <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 0.00 0.00 0.00 0.26 0.00 0.00 0.00 0.00 <br />d_M, Delay for Movement [s/veh] 9.42 10.92 8.32 10.98 11.43 10.59 7.87 .. 7.22 <br />Movement LOS A B A B B B A A A A A <br />95th-Percentile Queue Length [veh] 0.00 0.00 0.00 1.05 1.05 1.05 0.00 0.00 0.00 0.00 0.00 <br />95th-Percentile Queue Length [ft] 0.00 0.00 0.00 26.19 26.19 26.19 0.00 0.00 0.00 0.00 0.00 <br />d_A, Approach Delay [s/veh] 9.55 10.98 2.62 0.00 <br />Approach LOS A B A A <br />d_I, Intersection Delay [s/veh] 4.51 <br />Intersection LOS B <br />Scenario 5: 5 2040 No -Build PM Peak <br />Traffic Impact Study G35 Speck Consulting <br />Capstone Homes Residential Development <br />