Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop <br />Flared Lane <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 2.65 <br />d_M, Delay for Movement [s/veh] 2327.04 <br />Movement LOS F <br />95th-Percentile Queue Length [veh] 2.50 <br />95th-Percentile Queue Length [ft] 62.60 <br />d_A, Approach Delay [s/veh] 235.32 <br />Approach LOS F <br />d_I, Intersection Delay [s/veh] <br />Intersection LOS <br />Free Free <br />1.09 0.02 0.00 0.50 <br />135.28 34.22 10000.00 10000.00 <br />F D A A F F A <br />10.52 0.05 0.00 0.00 17.69 17.69 0.00 <br />263.07 1.21 0.00 0.00 442.25 442.25 0.00 <br />0.03 773.66 <br />A F <br />315.35 <br />F <br />Scenario 5: 5 2040 No -Build PM Peak <br />Traffic Impact Study G39 Speck Consulting <br />Capstone Homes Residential Development <br />