Laserfiche WebLink
n <br />city n <br />y <br />u <br />Generated with y o <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />Priority Scheme Stop Free Free <br />Flared Lane No <br />Storage Area [veh] <br />Two -Stage Gap Acceptance No <br />Number of Storage Spaces in Median <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio 0.01 0.01 0.01 <br />d_M, Delay for Movement [s/veh] 10.35 8.83 7.43 <br />Movement LOS B A A A A A <br />95th-Percentile Queue Length [veh] 0.06 0.06 0.00 0.00 0.46 0.46 <br />95th-Percentile Queue Length [ft] 1.51 1.51 0.00 0.00 11.58 11.58 <br />d_A, Approach Delay [s/veh] 9.84 0.00 0.33 <br />Approach LOS A A A <br />d_I, Intersection Delay [s/veh] 0.68 <br />Intersection LOS B <br />Scenario 7: 7 2040 Build_ PM Peak <br />Traffic Impact Study G70 Speck Consulting <br />Capstone Homes Residential Development <br />