My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Developer's Traffic Study recommended a trail connection from future Street H to Puma <br />Street due to pedestrian travel patterns. Furthermore, no trails are planned to the west of future <br />Street H. Another development is planned iust to the west of this development. <br />The project also requires execution of the Armstrong West Arterial/Collector Infrastructure <br />Project. The City Council has approved a Memorandum of Understanding (MOU) outlining cost <br />obligations between impacted Property Owners and the City. <br />The proposed street between proposed Pearson Park (quasi -public park on Outlot C) and Lake <br />Itasca Greenway (Outlot B) shall be modified to enhance pedestrian safety by introducing <br />reduced width and smaller on -street parking bays (often referred to as chokers'). <br />A Street Liaht Plan must be created and submitted to the City for review. The City will work <br />with Connexus Enerav to determine the final, appropriate Street Liaht Plan. <br />Please note that there appears to be obiection to the current proposal to vacate road easement for <br />former Puma Street south of Bunker Lake Boulevard. This is an item that will need to be <br />resolved before Final Plat approval, otherwise the Preliminary Plat will need to be modified. The <br />City requests a Letter from Connexus Enerav outlining acceptable alternatives to the <br />transmission line in question. <br />Action Item: <br />Action Item: <br />Action Item: <br />Amend the plan set to include a roundabout at the intersection of Street H and <br />Alpine Drive OR propose an equivalent approach the improves sight line and <br />pedestrian safety. City Staff has requested that the Developer consider a center <br />median pedestrian safety improvement with enhanced pedestrian signalization. <br />Amend the plans to include pedestrian crossings at Alpine Drive as indicated <br />above. <br />Amend the plan set to modify Street B as outlined above. <br />Amend the plan set to add a trail connection along Alpine Drive from Street H to <br />Puma Street. <br />Stormwater Pond <br />Based on projcct6 with imi'rar atormwater pond size and dopth, Pea.ff anticipates some concerns <br />regarding safety to bo razod by Pk?.ing Con mizvon. We encourage you to be vpc3 to <br />discuss stormwater safety, especially along publio traila and comphranso with atormwater <br />regulati�ra. nloazo rife o t1 Engino ing Review Memo for specific regulations. The Planning <br />Commission did raise concerns about the depth and slopes of stormwater ponds. However, the <br />Planning Commission found the response of the Developer and City Staff appropriate to address <br />safety and maintenance concerns. <br />It is our mission to work together to responsibly grow our community, and to provide quality, cost- <br />effective ective and efficient government services. <br />Riverstone Addition Planning Division Review April 28, 2017 (Preliminary Plat) <br />Page 8 of ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.