Review File: Riverstone <br />Preliminary Plat Exhibits <br />Engineering Review <br />June 8, 2017 <br />Page 2 of 3 <br />9. Final plat documents must have plan and profiles for streets, sanitary sewer, storm sewer <br />and watermain. Plan view must be shown for all pipes extending outside of the right-of- <br />way. <br />Sheet Snecific Comments: <br />Sheet 4: <br />1. A drainage and utility easement must be dedicated along Puma Street for the future Lift <br />Station. See additional comments on utility plan. <br />Sheet 8: <br />1. The future lift station must be placed in a drainage and utility easement outside of the <br />public right-of-way. The lift station must have a driveway access from Puma Street. <br />2. Rim and invert elevations are required on the proposed sanitary sewer in Puma Street. <br />The responsibility for construction of this line and the lift station has not been determined; <br />however, design information must be shown on this plan to ensure that the proposed line <br />will function properly. <br />3. Sanitary sewer north of the lift station can be 8", not 18" diameter pipe. <br />Sheets 10-13: <br />1. The grading plan must be revised to achieve the following separation distances per the <br />Lower Rum River Watershed Management Organization rules (LRRWMO). <br />The lowest floor elevation of all development, including basements, must be at least 3 feet <br />above the highest anticipated ground water table, 2 feet above the designated or designed <br />100 year flood elevation, or 1 foot above the emergency overflow, whichever is higher. <br />This requirement may be waived if evidence that a lesser separation can be achieved is: <br />• submitted and certified by a geotechnical engineer <br />• reviewed and approved by the city engineer or other party designated by the city <br />engineer, and <br />• approved by the LRRWMO. <br />If this process is pursued, the developer should consult with the LRRWMO Engineer before <br />beginning the study to discuss acceptable methodologies. <br />Information on the process was provided to the applicant. A table must be included on the <br />final grading plan listing the garage elevation, lowest floor elevation, controlling elevation <br />(groundwater or emergency overflow determined from the provided process documentation), <br />and method used. <br />