My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A preconstruction meeting will also be conducted before construction begins. Staff will then contact all abutting <br />property and business owners to provide updates on the proposed construction schedule and operations based on the <br />Contractors input at the preconstruction meeting. <br />Substantial completion will occur by September 1, 2017 to allow school buses unimpeded access to their normal <br />routes before the next school year begins, and final completion will occur by September 22, 2017. <br />The Assessment Hearing is scheduled for October 10, 2017. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />Staff has contacted all abutting businesses and property owners to inform them of the pending construction and <br />project schedule outlined above. The primary focus of staff's discussions with property owners has been to ensure <br />them adequate access is provided to all throughout construction. The plans call for all cross gutters at driveways <br />and streets to be reconstructed. This means all driveways will need to be closed while the concrete valley gutters <br />cure. Staff has attempted to minimize this time by using high -early concrete, which sets up quicker than standard <br />concrete, typically within 3 days or so, depending on weather. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #17-06-139 accepting bids and awarding a contract for construction <br />for Improvement Project #17-00, Sunwood Drive Reconstruction, to North Valley, Inc, in the amount of <br />$409,385.03. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />The low bid submitted by North Valley, Inc. of Nowthen, Minnesota, is $409,385.03. After adding indirect costs <br />for administrative (6%), engineering (15%), finance (1%), and legal (1%) costs, total project costs become <br />$503,543.59 <br />The improvements are proposed to be funded using a combination of street reconstruction bond proceeds, special <br />assessments to benefiting properties, and stormwater utility funds. <br />Recommendation: <br />Staff recommends alternative # 1. <br />Action: <br />Motion to adopt Resolution #17-06-139 accepting bids and awarding a contract for construction for Improvement <br />Project #17-00, Sunwood Drive Reconstruction, to North Valley, Inc, in the amount of $409,385.03. <br />Resolution 1706139 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 06/08/2017 03:20 PM <br />Form Started By: Bruce Westby Started On: 06/06/2017 07:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.