Laserfiche WebLink
Review File: Covenant Meadows <br />Final Plat Exhibits <br />Engineering Review <br />June 6, 2017 <br />Page 3 of 3 <br />Draft boring logs were included with the stormwater report. A location map for the borings <br />was not included. <br />This is summary of the required changes to the stormwater plan and plan sheets: <br />1. List the impervious area and required infiltration volume. <br />2. Modify the ponds to ensure the infiltration volume area will drain within 48 hours for <br />all storms. <br />3. Provide channel cross sections and calculations for the existing ditches along <br />Germanium Street to show maximum elevation for the 100 year storm. <br />Revised plans which address all of these changes must be submitted. <br />