My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Trott Brook Hall Addition <br />Final Plat and Site Plan Exhibits <br />Engineering Review <br />June 8, 2017 <br />Page 4 of 4 <br />Sheet 5.2: <br />1. The designer 's training information must be added to this sheet listing the date of the class <br />and expiration of the certificate. <br />2. Add a table showing the BMPs to be used on the project and the estimated quantities. <br />3. Label Trott Brook and the major roads on the map. <br />Stormwater Management Plan: <br />A stormwater summary and HYDROCAD reports were provided with the submittal. The <br />infiltration basin is sized for the new impervious areas. The existing impervious areas drain over <br />the new impervious areas to the proposed infiltration basin. The site has 2 locations where <br />stormwater leaves the site. The new impervious areas flow to both locations. Infiltration/ rate <br />control will be required for both outfalls. The infiltration and rate control must be sized for the <br />total flow coming to the respective outfall. The calculations will need to be revised to reflect the <br />actual flows coining to the infiltration/ detention areas. <br />1. Soil borings are required in the area of the infiltration practices to verify the soils are <br />suitable for infiltration. <br />2. The bottom of the infiltration basins must be at least 3 feet above the ground water level, <br />3. If water will be discharged directly to the infiltration area, then a sump manhole or water <br />quality treatment structure must be installed up stream of the infiltration basin to capture <br />sediment and debris. <br />4. Water cannot be directly discharged to the wetland. It must be treated as noted above. <br />5. Detailed procedures for constructing the infiltration basins and bringing them online will <br />be required in the final plans. <br />6. The title of the HydroCAD models must be revised to include the project name and <br />designate Existing or Proposed conditions. <br />7. The ponds must be less than 10 feet deep to comply with the recommended guidelines in <br />the Minnesota Stormwater Manual. <br />8. A Minimal Impact Design (MIDS) model or P8 model must be submitted showing the water <br />quality improvements provided by the stormwater system. <br />This site drains to the Trott Brook. Detailed calculations per the Ramsey Development <br />Requirements for TMDL must be submitted. The updated guidance sheet is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.