My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Homestead Road <br />Preliminary Plat Exhibits <br />Engineering Review <br />June 8, 2017 <br />Page 2 of 3 <br />Sheet Snecific Comments: <br />Final Plat Grading Plan Sheet S2: <br />1. The proposed rain gardens must be constructed as Stage 1 improvements. They must be <br />protected with silt fence until the vegetation is established around the new house. Grading <br />must be adjusted to maximize the capture of runoff from the impervious areas. <br />2. The proposed house labels must be changed to read: <br />Gar 876 <br />FF 876 <br />LF 874 <br />Where Gar = Garage, FF = First floor and LF = Lowest permissible floor. <br />3. The FEMA 100 year flood elevation must be shown on this sheet. The lowest floor <br />elevation of all development, including basements, must be at least 3 feet above the highest <br />anticipated ground water table, 2 feet above the designated or designed 100-year flood <br />elevation, or 1 foot above the emergency overflow, whichever is higher. <br />Final Plat Utility Plan Sheet S3: <br />1. See note for sheet S2. <br />2. The dashed line indicating possible future right-of-way must be changed as noted above. <br />3. Turn off the dimensions on the utility sheet. <br />4. Add City details STR25 and STR 26 to the plan set. The details are available on the City <br />web site. <br />5. Add the following notes to the final utility plan regarding abandoning the existing services. <br />1. The work shall be inspected by the City. <br />2. The contractor must provide a detour plan to the City for approval prior to commencing <br />work. <br />3. Pavement shall be sawcut per detail STR25, with the wear course milled to offset the <br />vertical joints prior to paving. <br />4. Sawcut lines must be shown on this plan for the Sidewalk, curbs and bituminous <br />pavement. <br />5. The excavation must be backfilled at the end of the day, restored with Class 5 and open <br />to traffic. <br />Tree Survey Report: <br />
The URL can be used to link to this page
Your browser does not support the video tag.