My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />Background: The Capstone Homes Development is proposed for construction on the vacant <br />land bounded by Puma Street, Alpine Drive, Trunk Highway (TH) 10, and Links at Northfork Golf <br />Course in Ramsey, Minnesota. This development will include 344 total residential units (98 <br />townhomes and 246 single family homes). The purpose of this study is to determine the traffic <br />impacts associated with the build out of the proposed development on the study intersections. <br />Results: The principal findings of this traffic study are: <br />• The proposed expansion is expected to generate approximately 2,912 new trips during <br />an average weekday (1,456 entering and 1,456 exiting), approximately 227 new trips <br />during the a.m. peak hour (53 entering and 174 exiting) and approximately 297 new <br />trips during the p.m. peak hour (189 entering and 108 exiting). <br />• The existing study intersections operate with acceptable delays and vehicle queues <br />today with slightly increased queueing and delay at TH 10/Alpine Drive. <br />• The study intersections are expected to operate acceptably during the 2040 no -build <br />and build scenarios with the exception of TH 10/Alpine Drive. <br />• TH 10/Alpine Drive experiences slightly higher than preferred queueing along Alpine <br />Drive, however this is expected at side street stop controlled intersection with heavy <br />mainline volume. <br />• Left turn lanes are not warranted based on the expected 2040 build year volumes and <br />mainline speeds. <br />• Right turn lane warrants are not fulfilled due to the mainline speeds remaining below <br />45 MPH, which is consistent for neighborhood streets, however, the right turn lane <br />volume thresholds were reached by the estimated 2040 Build volumes. <br />• There are no safety concerns with regards to turn lanes, due to the low queues, minimal <br />delay, and good sight distance provided at all site accesses <br />Recommendations: The following items are recommended based on the analyses contained in <br />this study: <br />• No additional intersection mitigation is required to help improve capacity. However, the <br />TH 10/Alpine Drive intersection should be monitored to determine when volumes <br />breach the Eight -Hour Traffic Signal Warrant as the projected volumes are heavily <br />dependent on a number of anticipated developments that are not guaranteed to occur. <br />• Coordinate TH 10/Alpine Drive improvements with MnDOT once the Eight Hour <br />Warrant is exceeded. <br />• If the speed limits along Puma Street or Alpine Drive are increased to 45 MPH or higher, <br />re-evaluate the Turn -Lane warrants. <br />• Construct a new sidewalk/trail along the southern edge of Alpine Drive connecting the <br />proposed access to the existing Alpine Drive/Puma Street intersection. The addition of <br />a north/south crosswalk should also be considered at this intersection to help promote <br />safe crossing to the existing northern sidewalk/trail. <br />• Ensure the proposed internal sidewalks connect to the external sidewalk/trail system. <br />• Work with Metro Transit or their affiliates to improve transit options within the project <br />area as the closest existing transit is located roughly 1.5 miles away at Ramsey Station <br />and Platform. <br />This study is based upon a concept plan from January 6, 2017. Assuming the general <br />characteristics of the proposed development remain approximately the same as documented, <br />minor changes in the final design are not expected to alter the results or recommendations of <br />this study. <br />Traffic Impact Study <br />Capstone Homes Residential Development <br />NSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.