My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:56 PM
Creation date
8/16/2017 2:24:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Staee II CITY Improvements. The future improvements the PERMITTEE must construct <br />or install are as follows: <br />a. Street lights per agreement with Connexus Energy <br />b. Installation of survey monumentation. <br />(the "Stage II Improvements"). The PERMITTEE must complete the construction of the <br />Stage II Improvements within one (1) year after the date upon which the Plat is recorded. <br />PERMITTEE must install the Stage II Improvements in accordance with the Plans. Per <br />City Code Section 117-615, the PERMITTEE shall provide the CITY with a set of re- <br />producible as -built plans in Computer Aided Drafting (CAD) format upon completion of <br />the Stage II Improvements and acceptance by the CITY. As as -built plans are a required <br />Stage II Improvement item per City Code Section 117-615, the CITY will not release the <br />required Stage I Improvement Financial Guarantee noted in paragraph #6 above until <br />CITY has received the as -built plans. Additionally, the PERMITTEE agrees to provide <br />to the CITY the plans in CAD format prior to the commencement of construction of the <br />Stage II Improvements. <br />14. Financial Guaranty for Stage II Improvements. The CITY does not require a financial <br />guaranty to secure the PERMITTEE'S obligation to construct the Stage II Improvements. <br />15. Warranty for Staee I and Stage II Improvements. The PERMITTEE shall provide a one <br />year warranty in the amount of $ .00 ( x .25), which is 25% of the cost of the Stage <br />I and Stage II Improvements. Said warranty shall be in force for one year following the <br />final acceptance of any required improvements and shall guarantee satisfactory <br />performance of said improvement. The warranty must be in the form of a Letter of Credit <br />in a form acceptable to the CITY'S Finance Director or a cash escrow. <br />16. Street Cleaning and Clean Up. After the street surfacing that is a part of the Stage I <br />Improvements is installed, the PERMITTEE shall clear any soil, earth, or debris from the <br />streets. From time to time, the CITY may remove accumulations of soil, earth, and debris <br />from the streets resulting from the construction of the Stage I Improvements. It shall be <br />the PERMITTEE'S responsibility to pay the costs associated with this necessary street <br />cleaning. Invoices from the CITY to the PERMITTEE for such costs shall be paid within <br />fifteen (15) days of the date of the invoice. <br />17. Payment of Development Fee's. The PERMITTEE must pay to the CITY the fees <br />described on Exhibit B which may include, but are not limited to, Park Land Dedication <br />Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) Fees, Water <br />Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral Fees, Storm <br />Management Fees, Street Light as well as Street Light Operation and Maintenance Fees. <br />18. Requirements for Building and Occupancy Permits. <br />a. No building permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br />provided the CITY Building Official with a Certificate of Survey; c.) the financial <br />guaranty described in Section 6 to the CITY; d.) obtained all necessary permits <br />from the Lower Rum River Watershed Management Organization and the Anoka <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.