My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:56 PM
Creation date
8/16/2017 2:24:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m. T 3 Plat is providing a foot bcrm and cxtcnsivc landscaping along Trunk <br />Highway 10. A berm and extensive landscaping will be installed according to the <br />approved plans. <br />It is understood that Tim will help acquire the letter requested from the MPCA <br />n. Tim will update this section to refer to Puma Street 18 Improvements <br />Exhibit C — <br />This exhibit should be understood as a 'stand-alone' document. Currently it does not. <br />THEREFORE, THE CITY AND THE PERMITTEE AGREE AS FOLLOWS: <br />1. Phase 1 Park Dedication and Trail Development Fee Obligation. The PERMITTEE is responsible <br />for a total Park Dedication and Trail Development Fee obligation of $183,600.00, as defined in <br />Exhibit B, #1 and #2. <br />2. Pearson Park Requirements. The PERMITTEE shall construct Pearson Park per Item 4.b above <br />and the Plans. The total cost of Pearson Park shall be at least $275,300.00. <br />Nature Based Play $100,000.00 <br />Landscaping, Irrigation (with H2O feature for play) $100,000.00 <br />Pavilion $50,000.00 <br />Drinking Fountain and mister w/ pet attachment $8,000.00 <br />On -street pedestrian safety treatments (50% park Dedication/ 50% <br />developer) $5,000.00 <br />Parking $4,620.00 <br />Benches (4) $7,680.00 <br />$275,300.00 <br />3. Lake Itasca Greenwav Requirements. The PERMITTEE shall construct Lake Itasca Greenway in <br />future phases per Item 4.a above and the Plans. The total cost of Lake Itasca Greenway shall be <br />at least $182,235. <br />100% Park Dedication Cash Credit for that square footage area necessary <br />for the trail (7' foot on either side of the centerline of the 10' foot <br />bituminous trail(s). This credit is at $1.74 per square foot. <br />Landscaping <br />Actual construction costs at $50 per lineal foot, plus actual cost for other <br />necessary costs, limited to retaining walls (the $50 per foot includes <br />ancillary costs). <br />Retaining Wall <br />Five (5) benches on slabs <br />$24,635 <br />$37,500 <br />$83,375 <br />$27,125 <br />$9,600 <br />$182,235 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.