My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:23 PM
Creation date
8/16/2017 2:25:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No: 1002020 <br />State Aid Agreements Engineer at Roseville five days notice of its intention to start the contract <br />construction. <br />B. Responsibility for the control of materials for the contract construction will be on the City and its <br />contractor and will be carried out according to Specifications No. 1601 through and including No. 1609 <br />in the State's current "Standard Specifications for Construction". <br />3.5. Completion of Construction. The City will cause the contract construction to be started and completed <br />according to the time schedule in the construction contract special provisions. The completion date for the <br />contract construction may be extended, by an exchange of letters between the appropriate City official and <br />the State District Engineer's authorized representative, for unavoidable delays encountered in the <br />performance of the contract construction. <br />3.6. Plan Changes. All changes in the Project Plans and all addenda, change orders, supplemental agreements <br />and work orders entered into by the City and its contractor for contract construction must be approved in <br />writing by the State District Engineer's authorized representative. <br />3.7. Compliance with Laws, Ordinances, Regulations. The City will comply and cause its contractor to comply <br />with all Federal, State and Local laws, and all applicable ordinances and regulations. With respect only to <br />that portion of work performed on the State's Trunk Highway Right -of -Way, the City will not require the <br />contractor to follow local ordinances or to obtain local permits. <br />3.8. Construction Documents Furnished by the City. The City will keep records and accounts that enable it to <br />provide the State, when requested, with the following: <br />A. Copies of the City contractor's invoice(s) covering all contract construction. <br />B. Copies of the endorsed and canceled City warrant(s) or check(s) paying for final contract construction, or <br />computer documentation of the warrant(s) issued, certified by an appropriate City official that final <br />construction contract payment has been made. <br />C. Copies of all construction contract change orders, supplemental agreements and work orders. <br />D. A certification form, provided by the State, signed by the City's Engineer in charge of the contract <br />construction attesting to the following: <br />i. Satisfactory performance and completion of all contract construction according to the Project Plans. <br />ii. Acceptance and approval of all materials furnished for the contract construction relative to <br />compliance of those materials to the State's current "Standard Specifications for Construction". <br />iii. Full payment by the City to its contractor for all contract construction. <br />E. Copies, certified by the City's Engineer, of material sampling reports and of material testing results for <br />the materials furnished for the contract construction. <br />F. A copy of the "as built" plan sent to the State Aid Agreements Engineer. <br />4. Right -of -Way; Easements; Permits <br />4.1. The City will obtain all rights -of -way, easements, construction permits and any other permits and sanctions <br />that may be required in connection with the local and trunk highway portions of the contract construction. <br />Before payment by the State, the City will furnish the State with certified copies of the documents for <br />rights -of -way and easements, construction permits and other permits and sanctions required for State <br />participation construction covered under this Agreement. <br />4.2. The City will convey to the State by quit claim deed, all newly acquired rights needed for the continuing <br />operation and maintenance of the Trunk Highway, if any, upon completion of the Project, at no cost or <br />expense to the State. <br />-3- <br />Payable Lump Sum (Municipal Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.