My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:23 PM
Creation date
8/16/2017 2:25:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 07/11/2017 <br />Submitted For: Patrick Brama, Administrative Services <br />By: Patrick Brama, Administrative Services <br />6. 1. <br />Information <br />Title: <br />Public Hearing: PSD LLC Business Park: Consider Establishing TIF District 16 and Approving a TIF Agreement <br />Purpose/Background: <br />PURPOSE <br />Consider multiple actions regarding the PSD LLC TIF Assistance Application which was accepted by the EDA and <br />City Council in April. This request is specifically related to PSD's proposed 56,000 square foot speculative <br />Industrial (Building #1). <br />(1) TIF PLAN: Consider Support ofthe attached Resolution #17-07-131 to Modify Development District 1, <br />Establish TIF District 16, and adopt TIF District 16 Plan. This step does not award TIF. This step allows the <br />City to award TIF (and provides a not -to -exceed budget number, which is higher than what the City is <br />proposing to award to PSD). <br />- -and-- <br />(2) TIF AGREEMENT: Consider support of the attached Resolution #17-07-132 authorizing execution of a <br />TIF Agreement. This is the actual TIF award for PSD LLC ($218,000 PV @ 4.75%). This document includes <br />all terms and conditions for this specific deal. <br />- -and-- <br />(3) INTER FUND LOAN: Consider support ofthe attached Resolution #17-07-133 which establishes an <br />"ability" for the City to utilize an inter fund loan to pay for up front administrative/ legal costs associated <br />with TIF District #16; and repay said inter fund loan with TIF District #16 proceeds (i.e. future PSD LLC <br />increment). <br />BACKGROUND (project) <br />Please see PSD LLC Case #2 for detailed background information (background, maps, and renderings). Regarding <br />this project specifically, PSD LLC plans to immediately construct a 56,000 square foot speculative industrial <br />building. PSD LLC is proposing a high -quality, highly functional, and market relevant building; which will include: <br />24' clear ceilings, both drive-in garages and sub -grade docks for every tenant, and glass facades along Highway 10. <br />The estimated total cost for PSD LLC's first building is $5.0M. <br />BACKGROUND (subsidy request) <br />PSD LLC has asked the City for financial incentives related to this 56,000 square foot speculative building <br />(building #1). Specifically, PSD LLC is requesting the City provide 9-years of pay -go TIF ($218,000 PV @ <br />4.75%). Based on their modeling and project pro -forma, PSD LLC believes this assistance is needed, in order to <br />make this project work. PSD has indicated there will be a multi -year tenant buildup period (i.e. there will be high <br />vacancy rates for the first 2-3 years) which makes this project very risky. To see PSD's original request letter, <br />please reference the April EDA case. <br />PSD LLC has competed and submitted a business subsidy application to staff, including a $10,000 non-refundable <br />
The URL can be used to link to this page
Your browser does not support the video tag.