My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:23 PM
Creation date
8/16/2017 2:25:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lour 1111.1siion: To work together to reiposibty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session 7. 4. <br />Meeting Date: 07/11/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #17-07-168 Ordering Feasibility Report for Improvement Project #18-00, Stanhope Terrace <br />Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #17-07-168 ordering a Feasibility Report for Improvement Project <br />#18-00, Stanhope Terrace Street Reconstructions. <br />Background: <br />The City of Ramsey's current 10-year Capital Improvement Plan, which covers calendar years 2017 to 2026, <br />identifies numerous streets proposed to be reconstructed in 2018 as part of the City's long-term Street Maintenance <br />Program. Among these streets are about 0.52 miles of streets within the Stanhope Terrace development, which is <br />located in the east -central portion of the City. These streets, which are identified in the attached figure, include: <br />• 153rd Court, west of Roanoke Street <br />• 154th Lane — Roanoke Street to Ute Street <br />• Ute Street — Alpine Drive to 154th Lane <br />• Ute Street, north of 154th Lane <br />Upon Council authorization, the Feasibility Report will be prepared in-house. While preparing the report, Staff will <br />explore available options for minimizing project costs, such as by reclaiming existing pavement sections rather than <br />removing and replacing all existing pavement. <br />The Feasibility Report will utilize data currently being gathered using Ground Penetrating Radar and soil borings <br />per previous Council approvals. <br />Notification: <br />No notifications are required for this case. <br />Observations/Alternatives: <br />Observations: <br />Preparing a Feasibility Report for the proposed improvements will allow staff to refine estimated project costs and <br />develop a proposed funding program, and allows for the use of special assessments against benefiting properties as <br />a partial funding source. <br />The Feasibility Report will explore numerous aspects of the proposed improvements including whether they are <br />feasible and necessary, whether they are cost-effective, and whether they should be completed alone or in <br />
The URL can be used to link to this page
Your browser does not support the video tag.