My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:23 PM
Creation date
8/16/2017 2:25:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C5.2: Stormwater Pollution Prevention Plan <br />Ll: Landscape Plan <br />3. Reauired Improvements. The improvements the PERMITTEE will construct or <br />install are as follows: <br />a. Parking lot with continuous concrete curb and gutter. <br />b. Stormwater ponding. <br />c. Stormwater piping. <br />d. Turn lanes. <br />e. Landscaping. <br />(the "Required Improvements"). <br />The PERMITTEE agrees to construct the Required Improvements according to <br />the terms and conditions of this Agreement and in accordance with the Plans and <br />the City Code. The PERMITTEE shall provide the CITY with a set of re- <br />producible as -built plans in Computer Aided Drafting (CAD) format upon <br />completion of the Required Improvements and acceptance by the CITY. The CITY <br />will not release in its entirety the Required Improvement Financial Guarantee noted <br />in paragraph #4 below until such as -built plans are received by the CITY. <br />Additionally, the PERMITTEE agrees to provide to the CITY the plans in CAD <br />format prior to the commencement of construction of the Required Improvements. <br />4. Reauired Improvement Financial Guarantee. The PERMITTEE shall provide a <br />financial guarantee to the CITY guaranteeing the construction of the Required <br />Improvements and their timely completion. The PERMITTEE shall be <br />responsible for a financial guarantee in the amount of One Hundred Eight Nine <br />Thousand Eight Hundred Seven Dollars and No Cents ($189,807.00), which <br />amount is 125% of the CITY Engineer's estimated cost of the Stage I Improvements <br />($151,846 x 1.25). Upon completion of Required Improvements (including the <br />removal of "temporary" erosion control measures as identified in the approved <br />Grading Plan), acceptance by the CITY, supported by appropriate lien waivers, the <br />PERMITTEE may request a reduction in the amount of the financial guarantee. <br />5. Inspection Fees for the Stage I Improvements. The PERMITTEE shall provide an <br />inspection fee to the CITY to inspect the Required Improvements. The <br />PERMITTEE shall be responsible for an inspection fee in the amount of Seven <br />Thousand Five Hundred Ninety Two Dollars and No Cents ($7,592.00), which <br />amount is 5% of the City Engineer's estimated cost of the Required Improvements <br />($151,846 x .05). The inspection fee must be in the form of a cash escrow. The <br />PERMITTEE may request a refund of the remaining balance in the escrow upon <br />completion of the Required Improvements, acceptance by the CITY. <br />6. Installation of the Reauired Improvements. The PERMITTEE shall obtain all <br />necessary permits from all governmental agencies before commencing construction <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.