Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br /> <br />D J27,PA146A <br /> <br />TH <br />ATEUNE ROJECT DDRESS VENUE AND <br />2017 TS <br />RAPROCK TREET <br />P. GT-A <br />ROJECT TITLEREENWAY ERRACE EON <br />E# <br />SCROW <br />D: Engineering <br />EPARTMENT <br />Name: Leonard Linton <br />T <br />Phone: 763 433-9834 <br />ECHNICAL <br />Email: llinton@ci.ramsey.mn.us <br />R: <br />EVIEWER <br /> <br />We offer the following comments regarding the Sketch Plan and Sketch Site Plan submittal for <br />Greenway Terrace - Aeon. The plans were prepared by Urbanworks Architecture, BKBM <br />Engineers, Damon Farber Associates and James R. Hill, Inc. This review was limited to the Civil <br />Plans prepared by BKBM Engineers and James R. Hill, Inc. <br /> <br />We offer the following comments on these sheets: <br /> <br />Preliminary Plat Sheets: <br /> <br />1.No comments. <br /> <br />C100 Demolition, Grading, Drainage, and Erosion Control Plan: <br /> <br /> <br />1.A legend showing the symbols and line types used is required on each sheet. <br /> <br />2.The symbol under keyed note 5 on Traprock street must be identified. <br /> <br />3.The proposed grading and drainage do not standout on this sheet. Consider adding sheets <br />organized by Demolition, Grading, Utilities, and Paving so that the key features stand out <br />from the background. <br /> <br />4.Provide elevations at the top and bottom of the proposed retaining walls. <br /> <br />5.Maximum slope is 4 H: 1V. <br /> <br />6.Identify the hatched area in the northwest corner of the parking lot. <br /> <br />7.Identify the parallel dashed lines extending onto the adjacent parcel. <br />Notes: <br /> <br />1.The City does the inspection for the Lower Rum River Watershed Management <br />Organization. The City will inspect the silt fence prior to commencement of any <br />construction activities. <br /> <br />2.A Construction Stormwater Permit from the MPCA will be required. <br /> <br />3.Logs of erosion control inspections will be emailed to the City weekly. A complete set <br />will be submitted to the City prior to granting Certificate of Occupancy. <br /> <br />4.Amend the note from <br /> <br /> <br />