Laserfiche WebLink
<br /> <br />c.Storm drainage facilities <br /> <br />d.Stormwater maintenance through ninety percent (90%) buildout <br /> <br />e.Streets <br /> <br />f.Concrete curb and gutter <br /> <br />g.Street traffic control signals <br /> <br />h.Lot grading <br /> <br />i.Trail development (not required) <br /> <br />j.Sidewalks <br /> <br />k.Electricity (within one-fourth mile) <br /> <br />l.Phone (within one-fourth mile) <br /> <br />m.Natural gas (within one-fourth mile) <br /> <br />n.Boulevard sodding <br /> <br />o.Water shut off boxes <br /> <br />p.Easement acquisition <br /> <br />q.As-built plans <br /> <br />r.Stage I financial surety <br /> <br /> <br /> DEVELOPER <br />Theagrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />DEVELOPER <br />City Code. Per City Code Section 117-615, the shall provide the <br />CITY <br /> with a set of re-producible as-built plans in Computer Aided Drafting (CAD) <br />CITY <br />format upon completion of the Stage I Improvements and acceptance by the . <br />As as-built plans are a required Stage I Improvement item per City Code Section <br />CITY <br />117-615, the will not release the required Stage I Improvement Financial <br />Guarantee noted in Section 6 below until said as-built plans are provided to the <br />CITYDEVELOPERCITY <br />. Additionally, the agrees to provide to the the plans <br />in CAD format prior to the commencement of construction of the Stage I <br />Improvements. <br /> <br />4.Additional Requirements Related to Certain Stage I Improvements. The <br />DEVELOPERCITY <br /> is required to hold a pre-construction meeting at offices. The <br />DEVELOPERCITY <br /> shall be responsible for contacting the to schedule the pre- <br />CITY <br />construction meeting. The will contact all utilities listed above and prepare <br />the agenda for the pre-construction meeting. Work within existing rights of way <br />and roadways must be completed under traffic, be brought back up to grade, and <br /> <br />must be restored to existing conditions within 24 hours. <br /> DEVELOPER <br />5.Lot Corner Staking. Themust install lot corner stakes at all lot <br /> <br />corners. <br /> DEVELOPER <br />6.Stage I Improvement Financial Guarantee. The shall provide a <br />CITY <br />financial guarantee, in a form of cash or an irrevocable letter of credit, to the <br />guaranteeing the construction of the Stage I Improvements and their timely <br />DEVELOPER <br />completion. The shall be responsible for a financial guarantee in <br />Ћ <br /> <br /> <br />