Laserfiche WebLink
<br />PERMITTEE <br />c. Proof of Authority. That the provide proof that the respective <br />PERMITTEE <br />governing boards of the have authorizedthe <br />execution of this Agreement. This proof of authority may be satisfied by providing <br />CITY <br />the with a certified copy of the minutes of the governing board of each entity <br />which grants such authority. <br /> <br /> <br />d.Site Plan Approval Required. That prior to construction, the PERMITTEE <br />agrees to secure Site Plan Approval as required by Ramsey City Code <br />Chapter 117. <br /> <br /> PERMITTEE <br />3. Lot Corner Staking. Themust install lot corner stakes at all lot corners. <br />PERMITTEECITY <br />4. . The must pay to the the fees as <br />required by Ramsey City Code an adopted Rates and Charges. These fees may include, but <br />are not limited to, Park Land Dedication Fees, Trail Development Fees, Sanitary Sewer <br />Connection (Trunk) Fees, Water Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, <br />Water Lateral Fees, Storm Management Fees, Street Light as well as Street Light Operation <br />and Maintenance Fees. <br />5. Requirements for Building and Occupancy Permits. <br />PERMITTEE <br />a. No building permit for any lot in the Plat shall be issued until the <br />has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br />CITY <br />provided the Building Official with a Certificate of Survey; c.) the financial <br />CITY <br />guaranty described in Section 6 to the ; d.) obtained all necessary permits <br />from the Lower Rum River Watershed Management Organization and the Anoka <br />County Soil Conservation District and has provided a copy of each such permit to <br />CITY; <br />the and <br /> <br />PERMITTEE <br />b. No occupancy permit for any lot in the Plat shall be issued until the <br />has: (a) constructed vehicular access to the lot, including the installation of at least <br />one layer of bituminous surfacing; (b) constructed all utilities and storm water <br />facilities this Contract requires to serve the lot and such utilities and storm water <br />facilities are in place, and operational (including utility extensions in Bunker Lake <br />CITY <br />Boulevard and Puma Street) and the has accepted those utilities and storm <br />CITY <br />water facilities; (c) for lots that have a slope of less than 2%, provided the <br />with a certificate of grading, prepared by a licensed (State of Minnesota) <br />professional land surveyor, certifying that the flattest grade on the lot is 1% or <br />greater; and (d) installed and planted the sod and landscaping that are required as <br />a part of the Stage I Improvements. <br /> <br />6. Miscellaneous. <br />a. Invalidity of Any Section. If any portion, section, subsection, sentence, clause, <br />paragraph or phrase of this Agreement is for any reason invalid, such decision shall <br />not affect the validity of the remaining portion of this Agreement. <br /> <br />Ћ <br /> <br /> <br />