My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 08/10/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 08/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:14:51 PM
Creation date
9/8/2017 8:35:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
08/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic Development Authority (EDA) <br />Meeting Date: 08/10/2017 <br />Submitted For: Patrick Brama, Administrative Services <br />By: Patrick Brama, Administrative Services <br />Title: <br />Inland Group <br />4. 1. <br />Purpose/Background: <br />Inland Group (http://inlandconstruction.com/) is a development company based out of Washington. One of their <br />subsidiaries is Affinity Living Communities (http://affinitvforliving.com/). Affinity specializes in senior, <br />independent living, market rate, multi -unit, apartment projects. Inland Group (Affinity) is interested in a 175-unit <br />project in The COR, located on 3-5 acres of city -owned land. <br />PROCESS <br />(1) Site Selection, August/ September <br />(2) Purchase Agreement, September/ October <br />(3) Entitlement Process, January --April <br />The first step in this process is to provide Inland Group with direction on site location. Then, once direction on site <br />location can be provided to the developer, the EDA can begin the standard purchase agreement process. Site <br />location will have a significant effect on the purchase agreement process (size of site, infrastructure needs, parks, <br />etc.). <br />CONCEPT MAPS <br />The last time the City considered a project in The COR (Stone Brook Children's Academy), it appeared a strong <br />desire existed by elected/ appointed officials to develop and review several professional site concepts upfront, as <br />part of the initial site selection process -- rather than having the developer only pitch their desired site. <br />Attached to this case are five site concepts. These concepts were developed by the City of Ramsey (not the <br />developer), based on discussions with the developer. These concepts are VERY preliminary. The intent of these <br />concepts is to display how this project could generally fit within The COR, from a high-level only. In other words: <br />from a preliminary perspective, does this project seem to meet our vision for The COR? Generally, staff believes all <br />of these concepts are worth considering. <br />The purpose of these concepts is NOT to get into a detailed discussion about exact number of square feet, exact <br />number of floors, exact number of parking stalls, exact building configuration, exactly how the surrounding land <br />uses are shown, or exactly how the building will look. The purpose is general/ high-level. Once the City can <br />provide the developer with general direction on a desired site (or two), the developer will come back with a more <br />detailed site concept layout (will be more detailed, and will also better reflect their vision). <br />For the sake of context, attached to this case are plans for a project this developer is currently constructing in Eagan. <br />This is a good base example of what they are looking at for Ramsey. With that said, adjustments will need to be <br />made to meet Ramsey zoning, vision, and demographics. <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.