Laserfiche WebLink
PERSONNEL COMPLEMENT <br />Public Works Superintendent 1.00 <br />Heavy Equipment Operator 1.00 <br />Mechanic 1.00 <br />Streets Lead Worker 1.00 <br />PW Maintenance Worker 3.00 <br />Temporary - Streets 0.50 <br />Street Maintenance Total 7.50 <br />1.00 1.00 <br />2.00 <br />1.00 <br />4.00 <br />0.50 <br />8.50 <br />2.00 <br />1.00 <br />4.00 <br />0.50 <br />8.50 <br />1.00 <br />2.00 <br />1.00 <br />4.00 <br />0.50 <br />8.50 <br />6488/6489 Other Contracted Services <br />Street Maintenance Program - <br />Long term road reconstruction 337,321 535,229 500,000 500,000 <br />Road Patching 95,313 - 50,000 10,000 <br />432,634 535,229 550,000 510,000 <br />6540 - Heavy Machinery <br />F350 truck with plow <br />1-Ton Truck <br />3/4 Ton Truck <br />Loader <br />192,507 <br />178,973 <br />186,000 <br />61,000 <br />188,000 <br />37,270 <br />371,480 247,000 225,270 <br />6580 - Other Equipment <br />Sidewalk Machine 53,234 <br />800 MHZ Radio - 3 Year Funding 5,100 5,100 5,100 <br />Kubota Tractor 15,950 - - <br />ATV Athletic Field Maintenance Machine - - 18,000 <br />74,284 5,100 5,100 18,000 <br />DESCRIPTION OF SERVICES: <br />The Street Maintenance Department is responsible for maintaining city streets, sidewalks, traffic signs, boulevards, ROW <br />mowing and the storm water collection system. <br />BUDGET HIGHLIGHTS <br />• Capital Equipment: Dump Truck with Plow: $188,000 (Net of $8,000 trade in) <br />• Capital Equipment: 3/4 Ton Truck: $37,270 (Net of $5,000 trade in) <br />• Capital Equipment: ATV athletic field machine: $18,000 <br />GOALS OF CURRENT YEAR BUDGET: <br />• Maintain and improve city's rating of 7.0 average of road condition <br />• Increase use of contracted services on pothole repair (velocity patching) <br />• Increase prevenative maintenace to prolong the life of our public streets <br />• Maintain our city vehicles and equipment to the highest level possible <br />Performance Measurements: <br />Crack filling (miles) <br />-Sealcoating (miles) <br />_Asphalt patching (tons) <br />2016 Actual I 2017 Estimate 1 2018 Projected <br />6.48 12.8 7 <br />7.55 7.73 7.5 <br />207 180 150 <br />-50- <br />