Laserfiche WebLink
ENGINEER'S ESTIMATE <br />CITY OF RAMSEY <br />POTASSIUM STREET CUL-DE-SAC CONSTRUCTION <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 Mobilization LS $1,500.00 1 $1,500.00 <br />3 Salvage and Re -spread Topsoil LS $1,500.00 1 $1,500.00 <br />4 Common Excavation CY $12.00 300 $3,600.00 <br />5 Aggregate Surfacing, Class 5 TN $20.00 400 $8,000.00 <br />6 Turf Establishment LS $1,000.00 1 $1,000.00 <br />$15.600.00 <br />Approximate $3,500 fee for engineering services not listed above. <br />The Schmitz's wish to resolve the this matter as soon as possible. I look forward to hearing from <br />you and working with you on resolving these issues. <br />Keith A. Pieper <br />Gilbert Alden PLLC <br />2801 Cliff Road East <br />Suite 200 <br />Burnsville, MN 55337 <br />Direct: 612-940-5633 <br />Email: Keith@GilbertAlden.com <br />5 <br />