My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Label curb type, street width, boulevard width and match station for new pavement. <br />4. Call out detail for curb opening. <br />5. Add vertical curve to new profile. Minimum is 100 ft or 20x algebraic difference. <br />6. Extend new profile to sawcut station. <br />7. A detour plan will be required for vehicles during installation of the service in 168tn <br />Avenue. A detour plan will also be required for pedestrians during this work. <br />8. Pedestrian ramps are required at Kamacite Street and the cul-de-sac. A site specific detail <br />is required for each lists elevations, grades and distances. The MNDOT 6 sheet set for <br />pedestrian ramps must be added to the set. <br />C7.2: <br />1. Replace detail 6 with a site specific street section. <br />L1.1: <br />1. A sheet specific legend is required listing all symbols and lines on this sheet. <br />2. Several trees to be removed along the north property line appear to be outside of the <br />project. <br />Stormwater Calculations <br />1. The Lower Rum River Watershed Management Organization is recommending approval <br />of the permit contingent on receiving a geotechnical report that supports the assertions that <br />the bottom of the infiltration basin is 3 feet above groundwater elevation and that the soils <br />will infiltrate at the stated rate. <br />2. The infiltration area and the stormwater detention area are the same. The detention area <br />must be totally dry 48 hours after the 100 year event. If this cannot be achieved then the <br />infiltration and detention areas must be separated. Calculations must be provided to <br />support the statement on the summary sheet. <br />3. Tables listing the P8 results are included. The P8 input data must be added to the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.