My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements for Lots 6 and 7, Block 1. The 2017 Water Lateral Benefit Fee is <br />$5,808 per lot. DEVELOPER must pay a Water Lateral Benefit Fee of Eleven <br />Thousand Six Hundred Sixteen Dollars and No Cents ($5,808 x 2 units = <br />$11,616.00). The DEVELOPER acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />7 Stormwater Management Fee. The DEVELOPER is responsible for satisfying <br />applicable Stormwater Trunk Fee requirements. The 2017 Stormwater <br />Management Fee is $473 per residential unit. The existing home is exempt from <br />this fee. DEVELOPER must pay a Stormwater Management Fee of Two <br />Thousand Eight Hundred Thirty Eight Dollars and No Cents ($473 x 6 units = <br />$2,838.00). The DEVELOPER acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />8. Street Liuht Fee. The DEVELOPER is not responsible for satisfying Street Light <br />Fees. <br />9. Street Light Operation and Maintenance Fee. The DEVELOPER is not responsible <br />for satisfying Street Light Operation and Maintenance Fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.