My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
writing, signed by the parties, and approved by a resolution of the CITY <br />Council. The CITY'S or the DEVELOPER'S failure to promptly take <br />legal action to enforce this Agreement shall not be a waiver or release. <br />c. Compliance with Laws and Regulations. The DEVELOPER represents to <br />the CITY that the Plat complies with all CITY, County, metropolitan, State, <br />and Federal laws and regulations, including but not limited to: subdivision <br />ordinances, zoning ordinances and environmental regulations. If the CITY <br />determines that the Plat does not comply, the CITY may, at its option, refuse <br />to allow any construction or development work in the Plat until the <br />DEVELOPER does comply. Upon the CITY'S demand DEVELOPER <br />shall cease work until there is compliance. <br />d. Mailbox Locations. If the DEVELOPER desires to construct mailboxes <br />within the public right of way, the DEVELOPER agrees that the placement <br />of mailboxes along public streets is subject to the approval by the CITY. <br />Utility locates will be necessary. Mailboxes shall not be located within the <br />bulb of cul-de-sacs. <br />e. Boulevard and Wetland Restoration. The DEVELOPER shall be <br />responsible for the cost of establishing seed in all boulevards within thirty <br />(30) days of the completion of the street improvements, and restoring all <br />other areas disturbed by the development grading operation in accordance <br />with the approved Grading and Erosion Control plan. The DEVELOPER <br />shall be responsible for the cost of cleaning any soil, earth, or debris from <br />the wetlands within and adjacent to this Plat resulting from grading <br />performed in the development of the Plat. <br />f. Construction, Hours and Entrance Signs. The CITY restricts construction <br />and delivery hours to Monday through Saturday 7:00 a.m. to 10:00 p.m. <br />(Saturdays require 72-hour notice to the CITY). The DEVELOPER is <br />required to provide a sign at each entrance point stating delivery and <br />construction operation hours. Said signs are not to exceed eighty (80) <br />square feet in size and must be clearly visible at all times during the <br />construction period. <br />g. <br />Construction Site Maintenance. The DEVELOPER shall adhere to all of <br />the CITY ordinances relating to, but not limited to, dumping of garbage, <br />site development, construction debris, open burning, etc. The CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.