Laserfiche WebLink
3. Lake Itasca Greenwav Reauirements. The PERMITTEE shall construct Lake <br />Itasca Greenway in future phases per Item 4.a above and the Plans. The total cost <br />of Lake Itasca Greenway shall be at least $182,235 and not include administrative or <br />overhead construction costs. <br />100% Park Dedication Cash Credit for that sauare footaae area necessary <br />for the trail (7' foot on either side of the centerline of the 10' foot <br />biltuminous trailfs). Thls credit is at $1.74 per sauare foot. <br />$24,635 <br />Landscaping $3.7,500 <br />Actual construction costs at S50 per lineal foot. plus actual cost for other <br />necessary costs. limiite.d to reta im ina walls (the $50 per foot includes <br />ancillary costs). <br />Retainina Wall <br />Five (51 benches on slabs <br />$83 375 <br />$27 125 <br />$9, 600 <br />4. Park Dedication and Trail Development Fee Credit for Pearson Park. The PERMITTEE shall be <br />credited an amount not to exceed $275,300.00. The remaining credit in the amount of $91,700.00 <br />will be credited towards future phases of the Plat. <br />5. Pearson Park Financial Guarantee. The PERNIITTEE shall provide a financial guarantee to the <br />CITY guaranteeing the construction of the Stage I Improvements and their timely completion. <br />The PERNIITTEE shall be responsible for a fmancial guarantee in the amount of ($344,125.00), <br />which amount is 125% of the City Engineer's estimated cost of the Pearson park Improvements <br />($275,300 x 1.25). Upon completion of Pearson Park Improvements (including the removal of <br />"temporary" erosion control measures as identified in the approved Grading Plan), acceptance by <br />the CITY, supported by appropriate lien waivers, The PERMITTEE may request a reduction in <br />the amount of the fmancial guarantee. <br />6. Pearson Park Inspection Fee. The PERMITTEE shall provide an inspection fee to the CITY to <br />inspect the Pearson Park Improvements. The PERMITTEE shall be responsible for an inspection <br />fee in the amount of ($13,765.00), which amount is 5% of the City Engineer's estimated cost of <br />the Stage I Improvements ($275,300 x .05). The inspection fee must be in the form of a cash <br />escrow. The PERMITTEE may request a refund of the remaining balance in the escrow upon <br />completion of the Stage I Improvements, acceptance by the CITY. <br />7. Warranty for Pearson Park Improvements. The PERNIITTEE shall provide a one year warranty <br />in the amount of $68,825.00 ($275,300 x .25), which is 25% of the cost of the Pearson Park <br />Improvements. Said warranty shall be in force for one year following the final acceptance of any <br />required improvements and shall guarantee satisfactory performance of said improvement. The <br />warranty must be in the form of a Letter of Credit in a form acceptable to the CITY'S Finance <br />Director or a cash escrow. <br />8. Credit for Lake Itasca Greenway. Credit will be provided for Lake Itasca Greenway per Item 4.a <br />above at the time the phase requiring this improvement is constructed. <br />3. The terms and conditions of the Development Agreement remain in effect <br />except to the extent modified by this Amendment No. 1. To the extent there is <br />Formatted: Normal, Indent: Left: 0.5", Space After: 0 <br />pt <br />