My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/19/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 09/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:10:34 AM
Creation date
10/4/2017 10:23:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.INTRODUCTION <br />2.1Authorization <br />The preparation of this report was authorized by the Ramsey City Council on August8th,2016. <br />This project has been designated as City Improvement Project No. 17-00. <br />2.2Program Overview <br />In support of the City’s long-term Street Maintenance Program,theexisting bituminous <br />pavement section is proposed to be reconstructed using a stabilized full-depth reclamation <br />(SFDR) process, all damaged concrete curb and gutter sections will be removed and replaced, <br />and other appurtenant work will be completed as outlined in this report. <br />The City’s pavement evaluation process involves a visual evaluation of each street’s pavement <br />surface based on the type, extent and severity of each pavement distress observed. Numerous <br />types of pavement distresses may exist within a pavement section including, but not limited to, <br />alligator cracking, block cracking, longitudinal cracking, transverse cracking, rutting, raveling, <br />shoving, potholes and patches. This field data is then used to rate the pavement condition. <br />The City uses the Pavement and Surface Evaluation Rating (PASER) system to rate pavement <br />condition.A PASER rating is a numerical index between 1 and 10 indicatingthe condition of a <br />pavement based on the various pavement distresses recorded during visual observations. A <br />PASER rating of 10 represents brand new pavement, while a PASER rating of 1 represents a <br />pavement section that has fallen into completedisrepair requiring fullreconstruction. <br />In the fall of 2016, this segment of Sunwood Drive was rated with PASER ratings of 3 and 4, <br />depending on location. <br />2.3Scope <br />City of RamseyImprovement Project 17-00proposes to reconstruct the existing bituminous <br />pavement,to remove and replace damaged concrete curb and gutter sections,and to complete <br />other appurtenant work onSunwood Drive between Ramsey Boulevard/CSAH 56 and Bunker <br />Lake Boulevard /CSAH 116which totals approximately 3,050 linear feet (0.58 miles) in length. <br />The existing bituminous pavement is proposed to be reconstructed using a Stabilized Full Depth <br />Reclamation, or SFDR, process. The SFDR process would involve milling roughly the top 3 <br />inches of existing bituminous pavement and disposing of the millings off site. Allremaining <br />existing bituminous pavement would then be ground and mixed into the existing aggregate base. <br />This reclaim material would then be spread over the existing subgrade, which will be reshaped <br />and compacted as needed. A stabilizing agent, such as an asphalt emulsion,will be mixed into <br />the reclaim material prior to shapingand compactingit.Four(4)inches of new bituminous <br />pavement will then be placed on topof the stabilized reclaim material. This will result in a 10- <br />ton pavement design meeting current State Aid pavement design standards. <br />Figure 1 <br />A map showing the location and scope of the proposed improvements is included as in <br />Appendix A <br />. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of RamseyProject No. 17-00 <br />Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.