My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/19/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 09/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:10:34 AM
Creation date
10/4/2017 10:23:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SunwoodDriveΑStreetImprovements <br />Ramsey,Minnesota <br />NTIProjectNo.16.61770.100 <br />PLACEMENTandCOMPACTIONOFENGINEEREDFILL <br />UnlessotherwisesupersededwithinthebodyoftheGeotechnicalExplorationReport,thefollowing <br />criteriashallbeutilizedforplacementofengineeredfillonproject.Thisincludes,butisnotlimited <br />toearthenfillplacementtoimprovesitegrades,fillplacedbelowstructuralfootings,fillplaced <br />interiorofstructure,andfillplacedasbackfilloffoundations. <br />Engineeredfillplacedforconstruction,ifnecessaryshouldconsistofnatural,nonorganic,competent <br />soilsnativetotheprojectarea.Suchsoilsmayinclude,butarenotlimitedtogravel,sand,orclays <br />withUnifiedSoilClassificationSystem(ASTMD2488)classificationsofGW,SP,orSM.Useofsiltor <br />clayeysiltasprojectfillwillrequireadditionalreviewandapprovalofprojectGeotechnicalEngineer <br />ofRecord.SuchsoilshaveUSCSclassificationsofML,MH,MLCL,MHCH.Useoftopsoil,marl,peat, <br />otherorganicsoilsconstructiondebrisand/orotherunsuitablematerialsasfillisnotallowed.Such <br />soilshaveUSCSclassificationsofOL,OH,Pt. <br />Engineeredfill,classifiedasclay,shouldbetemperedsuchthatthemoisturecontentatthetimeof <br />placementisequaltoandnomorethan3percentabovetheoptimumcontentforasdefinedbythe <br />appropriateproctortest.Likewise,engineeredfillclassifiedasgravelorsandshouldbetempered <br />suchthatthemoisturecontentatthetimeofplacementiswithin3percentoftheoptimumcontent. <br />Allengineeredfillforconstructionshouldbeplacedinindividual8inchmaximumdepthlifts.Each <br />liftoffillshouldbecompactedbylargevibratoryequipmentuntiltheinplacesoildensityisequalto <br />orgreaterthanthecriteriaestablishedwithinthefollowingtabulation. <br />1 <br />CompactionCriteria(%respectiveProctor) <br />TypeofConstructionClaySandorGravel <br />GeneralEmbankmentFillMin.95Min.95 <br />EngineeredFillbelowFoundationsNAMin.98 <br />EngineeredFillbelowFloorSlabsNAMin.98 <br />EngineeredFillplacedasPavementAggregateBaseNAMin.100 <br />EngineeredFillplacedtowithin3feetofpavementMin.95Min.95 <br />aggregatebase <br />EngineeredFillplacedwithin3feetofpavementMin.100Min.100 <br />aggregatebase <br />1Unlessotherwiserequired,compactionshallbebasedontheStandardProctorTest(ASTMD698). <br />Densitytestsshouldbetakenduringengineeredfillplacementtodocumentearthworkhasachieved <br />necessarycompactionofthematerial(s).Recommendationsforinteriorfillplacementandbackfillof <br />foundationwallsarepresentedwithinothersectionsofthisreport. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.