My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 11/18/2004
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2004
>
Agenda - Parks and Recreation Commission - 11/18/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 9:50:36 AM
Creation date
11/12/2004 2:56:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
11/18/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-' 200] Com£rehensive ?lan <br /> Amended £ebrzw, C/ 26. 2002 <br />~'tc~.bh~'n Design GuideIin~: ~uiid[n~ o~:f o( design criteria that may be established <br />dwough a highway corridor study on Highway 10~ similar criteria should be <br />estabi~shed ~or dcvefopment within fl~e co~fdor that protects scenfc vistas, utilizes <br />solar energy, restores native vegetation and blends the bnilt environment into-the <br />namraI environment. These desi~ criteria should apply to .public and private <br />development projects and could be established through an overlay district. <br /> <br />Use r/re £'uno'e £cmd (:'se ?!an ~ts a Guide ro Furure Deve[o£menr: The goals and <br />policies found h] the furore land use element o~~ the 1998 Comprehensive Plan focus <br />on environmentally sound land use that calls for urban services to include the majority <br />or' the development within the corridor by the year. 2015 (see Development Staging <br />Section,). The predominant land tlse in the con'idor is Low dens/q/residential, which <br />allows a variety, oFhousing ~'pes and styles at a dens/ry.' Lip tO 4 units per net acre. The <br />plan :flsa calls rbr a redevelopment study or' some of the lands along the Highway I0 <br />Corridor to reevaluate the commercial use. The goals and policies of the furore land <br />use plan shouid be adhered to within the Critical Area Co~xidor. <br /> <br />Deve/o£ E~htc:~tioncff ?ro~'rm~s.' Working witln N~'RJ~-\ agencies, incorporate river <br />protection education elements into events such as recycling drop off days and other <br />community wide events. Encourage and participate in regional pro,ams that help <br />educate property owners within the con'idor on river quality- issues and how their own <br />individual practices can help clean up the dyer (i.e., Best Managemen/: Practices). <br /> <br />Purszte Gr'~mts and Funding Sources jbr Acquisition 2/ Sensirive Lands: Some land <br />areas have been identified as significant environmental features that should be <br />protected and managed as permanent open space. These areas are designated as Site <br />[, Site 2 and the continuous trail corridor on the MN?iL* opportunity map illustrated <br />in Figure XI-6. <br /> <br />Site i features significant woodlands that provide natural habitat. This area is <br />adjacent to residential properties on the south and agriculture property on the north, <br />which will likely succamb to urban development in the distant future. This site should <br />be preserved through private sector actions. This could be done through such means <br />as transfer of development rights where density is transferrsd to the more developable <br />property, to the north and east, purchase of development rights, or conservation <br />easement purchase. Acquisition by the public should be a last priority for protection <br />of Site I. <br /> <br />Site.:" features some lands that are protected by the floodplain ordinance, some lands <br />protected through wetlands regulations and some lands that are not protected at all. <br />Site 2 is a more significant piece of land because of its river t>ontage. Public <br />Acquisition would appear to be the priori~ for protection of this site because <br />floodplain ordinances mav still pe~it ce~xain development activiw. A study should <br />be completed to establish a detailed acquisition boundary of significant lands and a <br />management pkm shouid be put in place tlmt Focuses on Iow cost passive uses <br />possii~l'/restoring [ands [hat have been dist'.n'bed back to native vegetation or a small <br />scenic overlook sire. biational Parl< Service Funds cottJd be used in tandem with <br />?undin~ ?)'om tile ('ip,. DNR. Men'~opolkan Council, ~:ot~-profit groups or other entiw <br />inrer'~stcci hq ri,/erfl'ont protect o ~ <br /> <br />Trail C )rr!&)r represents a ,zene:-al iocad,:,a ?'c,r a trail corridor Gat would <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.