Laserfiche WebLink
PAY ESTIMATE NO. 6 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "A" - S.A.P. 199-104-07 - Sunwood Drive N~V Continued <br /> <br />ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- EXTENSION <br />NO. AMOUNT DATE <br />60 IF & l Sign Panel Type "D" 7 EACH $258.00 $1,806100 $0.00 <br />6 l 'TYPE III BARR[DADE l I EACH $309.60 $3,405.60 $0.00 <br /> <br /> 62 PAVEMEN'F MESSAGE (ONLY) POLY PREFORMED 32 EACH $387.00 $I2,384.00 $0.00 <br /> 63 PAVEMENT MESSAGE (RR CROSSING) PAINT 2 EACH $159.96 $319.92! 1 $150.98 <br /> 64 PAVEMENT MESSAGE (COMBINATION ARROW)PAINT 4 EACH $82.56 $330.241 $0.00 <br /> 65 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORMED 12 EACH $309.60 $3,715.2£ $0.00 <br /> 66 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORMED 28 EACH $309.60 $8,668.8£ $0.00 <br /> 67 4" BROKEN I.INE YELLOW EPOXY 200 LF $0.51 $102.0( $0.00 <br /> 68 4" SOLID I.INE WItlTE - EPOXY 12500 LF $0.50 $6,250.0( $0.00 <br /> 69 4" BROKEN LINE WHITE - EPOXY 3150 LF $0.50 $1,575.0( $0.00 <br /> 70 24" STOP LINE WHITE - EPOXY 800 LF $7.22 $5,776.0( $0.00 <br /> 71 36" SOLID LINE WH1TE- EPOXY 1100 LF $8.67 $9,537.0( $0.00 <br /> 72 4" DOUBI,E SOLID LINE YELLOW - EPOXY 7350 LF $1.01 $7,423.5C $0.00 <br /> <br /> 73 24" SOLID LINE YELLOW - EPOXY 1670 LF $5.68 $9,485.6C $0.00 <br /> <br /> 74 4" SOLID LINE WtlITE - PAINT 3000 LF $0.4[ $1,230.0£ $0.00 <br /> <br /> 75 4" DOUBLE SOLll) LINE YELLOW - PAINT 2300 LF $0.83 $1,909.0( $0.00 <br /> <br /> 76 2,1" SOLID I,[NE YELLOW - PAINT 330 LF $2.58 $851.4C $0.00 <br /> 77 NMC I,OOP I?ETECTOR 6' X 6' 43 EACH $485.04 $20,856.75 24 $.1.1,840.~ <br /> <br /> 78 PVC HANDHOLE (METAL FRAME AND COVER) 23 EACH $567.60 $13,054.8( .13 $7.378.80 <br /> 79 INSTALL 4"-6" PVC (SCH 40) CONDUIT 2400 LF $6.45 $15,480.0( 2400 $.15,480.00 <br /> 80 F & I 4" RIGID STEEL CONDUIT 430 LF $25.18 $10,827.4( 430 $'10,827.40 <br /> 8 l BALE CHECK 200 EACH $l 1.87 $2,374.0C <br /> 82 SIt,T FENCE TYPEMACItINE SLICED 1000 LF $1.8t $1,810.00, $0.00 <br /> 83 TEMPOP, AI~,Y CONSTI{1JCTION ROCK ENTRANCE 2 EACH $2,412.51 $4,825.02 $0.00! <br /> <br /> 84 SEEDING 3.0 ACRE $258.00 $774.00 $0.00 <br /> <br /> 85 SODDING, TYPE LAWN 5000 SY $2.48 $12,400.00 2000 $4,080.00 <br /> 86 SEED MIXTIJRE 260 300 LB $2.63 $789.00 $0.00 <br /> 87 MULCH MATERIAL TYPE 3 6 TON $154.80 $928.80 $0.00 <br /> 88 EROSION CONTROL BI,ANKETS CATEGORY 3 100 SY $1.55 $155.00 $0.00 <br /> 89 COMMERCIAL FEI~.'I'ILIZER ANALYSIS 24-2-24 1200 LBS $0.36 $432.00 $0.00 <br /> <br />Total llid Schednle "A" <br /> <br />$1,951,654.92 $1,322,232.55 <br /> <br />G:lSharedDocslMunicipallARamseyl <br />3171/ra3171pe.xlsPAY ESTIMATE NO. 6 PE-3 Rev. 4/14/04 <br /> <br /> <br />