Laserfiche WebLink
PAY ESTIMATE NO. 6 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "C" - S.A.P. 199-109-01 - Rhinestone Street NW Continued <br /> <br /> I <br /> CONTRACT <br /> [ USED TO- <br />ITEM ITEM QTY UNIT UNIT COST~ EXTENSION <br />NO. AMOUNT DATE <br /> <br /> 245 BALE CHECK 50 EACH $11.87 $593;50 $0.0{3 <br /> 246 ;[I.T FENCE TYPE MACHINE SLICED 300 LF ' $1.81 $543.00 $0.00l <br /> 247 TEMPORARY CONSTRUCTION ROCK ENTRANCE I EACH - $2,412.51 $2,412.51 $0.00 <br /> 248 SEEDING 1.3 ACRE $258.00 $~35.40 $0,001 <br /> 249 SODDING, TYPE LAWN 3700 SY $2.48 $9,176'.00 $0.00 <br /> 250 SEED MIXTURE 260 130 LB $2.63 $341.901 $0.00 <br /> 251 MULCH MATER[AL TYPE 3 2.6 TON $154.80 $402.4~ $0:00 <br /> 252 EROSION CONTROL BLANKETS CATEGORY 3 100 SY $2.32 $232.0C $0.00 <br /> 253 COMMERCIAL FERTII.IZER ANALYSIS 24-2-24 520 LBS $0.36 $187.2C $0.00 <br /> <br />To tal Bid Sc hedn le "C" $600,056.05 $293,424.01 <br /> <br />Bid Schedule "D" - Rhinestone Street t"O,V Local Funding <br /> <br />ITEM ITEM QTy UNIT UNIT COST CONTRACT USED TO- EXTENSION <br />NO. AMOUNT DATE <br />254 REMOVE BITUMINOIJS PAVEMENT 100 SY $5.72 $572.0(] 191 $1,092.52 <br />255 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 400 LF $0193 $372.00 860 $799.80 <br />256 COMMON EXCAVATION, EV 200 CY $3.20 $640.0(] $0.00 <br />257 SALVAGED TOPSOIL FROM STDCKPILE, SV 100 CY $6.60 $660.0(] $0.00 <br /> <br /> 258 AGGREGATE BASE CLASS 5 MOD[FlED . 100 TON $9.79 $979.0(] 100 $979.00 <br /> <br /> 259 TYPE MV3 WEARING COURSE MIXTURE 50 TON $37.00 $1,850.00 50 $1,850,00 <br /> 260 15" RC SAFETY APRON 2 EACH $487.34 $974.68 $0.00 <br /> 26l 4" DUCTILE IRON PIPE Ct.ASS 53 200 LF $11.35 $2,270.0(] 189 $2,145.15 <br /> 262 6" DUCTILE IRON PIPE CLASS 53 100 LF $11.73 $1,173.00 66 $774.18 <br /> 263 8" DUCTILE IRON PIPE CLASS 52 640 LF $14.73 $9,427.20 502 $7,394.46 <br /> 264 12" DUCTILE IRON PIPE, CLASS 52 2700 LF $21.77 $58,779.00 2400 $52,248.00 <br /> 265 8" SDR 26 PVC PIPE (10-12') 120 LF $9.33 $1,119.6(] 230 $2,145.90 <br /> 266 8" SDR 26 PVC PIPE (12-14') 95 LF $9.68 $919.60 95 $919.60 <br /> 267 8~' SDR 26 PVC PIPE (14-16') 40 LF $10.52 $420.80 40 $420,80 <br /> 268 12" SDR 26 PVC PIPE (10-12') 401 LF $14.10 $5,654.1(] 401 $5,654.10 <br /> 269 12" SDR 26 PVC PIPE (12-14') 55 LF $14.46 $795.3(] $0.00 <br /> 270 21" SDR 26 PVC PIPE (10-12') 240 LF $55.36 $13,286.4C 217 $~2,013.12 <br /> <br /> 271 21" SI)t?, 26 PVC PIPF. (12-14') 760 LF $55.81 $42,415.6(: 760 $42,41fi.~0 <br /> <br />G:lSharedDocslMunicipaFARamsoyl <br />3171/ra3171pe.xlsPAY ESTIMATE NO. 6 <br /> <br />PE-9 Rev. 4/14/04 <br /> <br /> <br />