My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B RAU N <br />INTERTEC <br />The Science You Build On. <br />Client: City of Ramsey <br />Location: 6401 Highway 10, Ramsey, MN 55303 <br />Date of Inspection: November 10 & 11, 2016 <br />Project: B1610732.00 <br />Table II. Bulk Asbestos Analytical Results <br />Sample No. Sample Location Material Asbestos Content (%)1 <br />1A Exterior East Side South End Stucco (green, tan, orange, & red) N.D.2 <br />1B Exterior North Side Above Garages Stucco (green, tan, orange, & red) N.D. <br />1C Exterior West Side North End Stucco (green, tan, orange, & red) N.D. <br />1D Exterior West Side Middle Stucco (green, tan, orange, & red) N.D. <br />1E Exterior West Side South End Stucco (green, tan, orange, & red) N.D. <br />2 Exterior East Side SE Corner Brick & mortar N.D. <br />3 Exterior East Side South End Caulk (gray) - vertical wall expansion N.D. <br />joints <br />4 Exterior East Side South End Caulk (tan) - horizontal wall expansion N.D. <br />joints <br />5 Exterior East Side North End Caulk (brown) - window frames N.D. <br />6 Exterior West Side North End Caulk (tan/orange) - wall, window, & N.D. <br />door frames <br />7 Exterior West Side South End Caulk (gray, tacky) - glass block N.D. <br />window frames <br />8 Exterior South End By Entrance 8" x 8" concrete block & mortar N.D. <br />9 Kitchen South End By Door Sheetrock/joint compound N.D. <br />By -Drive Thru Caulk (gray, rubbery) - concrete floor <br />10 Kitchen At Floor N.D. <br />Window expansion joints <br />11 Kitchen South End At Ceiling 2' x 4' lay -in ceiling panels (white), N.D. <br />sheetrock with vinyl cover <br />12 Kitchen East Side At Ceiling 2'x 2' lay -in ceiling panels (red), N.D. <br />sheetrock with vinyl cover <br />13 Kitchen South End At Ceiling 2'x 2' lay -in ceiling panels (white), N.D. <br />pocks & pinholes <br />14 Kitchen South End At Wall End Adhesive (tan) - behind fiberglass wall N.D. <br />paneling <br />15 Kitchen South End By Door 4" baseboard (gray) with adhesive N.D. <br />(tan) <br />16 Kitchen South End At Window Glaze (black, rubbery) - on windows N.D. <br />17 Dining Room North Side At Door Epoxy flooring (green) N.D. <br />18 Dining Room North Side At Floor Epoxy flooring (gray) N.D. <br />Table II. Bulk Asbestos Analytical Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.