Laserfiche WebLink
Public Works Committee 5. 1. <br />Meeting Date: 09/19/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommendation to City Council Regarding Connexus Energy's Special Assessment for Sunwood Drive <br />Reconstruction <br />Purpose/Background: <br />Up to 25 percent of project funding for the Sunwood Drive Reconstruction project is proposed to come from special <br />assessments to benefiting properties. A total of nine properties were identified as benefiting properties with this <br />project. One of the nine properties is Connexus Energy whose primary access for their service vehicle fleet uses <br />their access onto Sunwood Drive. <br />Connexus Energy has never formally objected to their preliminary assessment, but they have voiced concerns with <br />their assessment on several occasions, and have met with Staff numerous times to discuss their assessment. <br />However, Connexus Energy is now requesting to discuss their assessment with the Public Works Committee prior <br />to the Assessment Hearing scheduled for October 10, 2017. <br />Attached is a copy of the Sunwood Drive Reconstruction project Feasibility Report which discusses how special <br />assessments were calculated for this project, and includes a preliminary assessment map and roll as approved by <br />the City Council. Also attached is a copy of the City's Special Assessments Policy. <br />Staff is preparing a brief presentation to summarize how special assessments were calculated for this project, <br />including the Connexus Energy parcel. Mike Bash, Vice President and Chief Financial Officer for Connexus <br />Energy, will be in attendance and will be prepared to present additional information to the Committee to explain <br />why they believe their preliminary assessment should be reduced. <br />Timeframe: <br />Staff anticipates approximately 30 minutes will be needed for this case. <br />Observations/Alternatives: <br />Observations: <br />It is important to note that contributing traffic volumes and/or vehicle types were not considered in calculating <br />assessments for any of the benefiting properties. Based on vehicle impacts of all existing benefiting properties, <br />Connexus Energy's service vehicle fleet likely has the greatest negative long-term impact on the service life of <br />Sunwood Drive. <br />Staff has discussed and reviewed Connexus Energy's concerns and arguments regarding their assessment on several <br />occasions and believes that the assessment proposed is defensible and in accordance with state law. Consequently, <br />we do not recommend reducing their assessment prior to the Assessment Hearing. <br />If Connexus Energy's assessment is reduced, all other assessment amounts will need to be reviewed and adjusted <br />accordingly and concurrently, which could delay the Assessment Hearing and increase the City's overall <br />contribution to the project. <br />Alternatives: <br />Alternative # 1 - Motion recommending City Council adoption of special assessments for the Sunwood Drive <br />Reconstruction project consistent with the preliminary assessment calculations outlined within the Feasibility <br />