Laserfiche WebLink
Public Works Committee 6. 1. <br />Meeting Date: 09/19/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Riverdale Drive Extension - Traprock St. to Ramsey Blvd. (#16-20) <br />• This project completes the south Highway 10 frontage road between Llama Street and Tungsten Street <br />• Construction began last week <br />• Construction will be substantially complete by November 2017 <br />• Final completion will occur in 2018 <br />• Sunwood Drive Reconstruction (#17-00) <br />• Construction is substantially complete <br />• Final completion will occur in 2018 <br />• Alpine Drive Reconstruction (#17-01) <br />• Construction is substantially complete <br />• Final completion will occur in 2018 <br />• 2017 Crackseal and Sealcoat Improvements (#17-03) <br />• Approximately 13.6 miles of public streets throughout the City were crack sealed and sealcoated <br />• Construction is substantially complete, but striping remained as of the time this report was prepared <br />• Sunwood Drive Striping Improvements (#17-04) <br />• The concrete pavement on Sunwood Drive between Zeolite Street and Rhinestone is being restriped <br />• Construction is scheduled to be complete before September 19 <br />• Bunker Lake Boulevard Utilities Extensions (#17-09) <br />• Construction is complete <br />Anoka County Improvement Projects <br />• Hanson Boulevard/CSAH 78 Grade Separation @ BNSF Railway Crossing (2017) <br />• Reconstruct County State Aid Highway 78 (CSAH 78) / Hanson Boulevard to a 4-lane divided section <br />• Construct a grade -separated overpass for Burlington Northern Sante Fe (BNSF) railway crossing <br />• Hanson Boulevard/CSAH 78 Reconstruction (2018) <br />• Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided <br />section <br />• Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />• This project is currently unscheduled and unfunded <br />MnDOT Improvement Projects <br />• Trunk Highway 10 Cable Median Barrier Installation (2018) <br />• Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017) <br />• Preliminary design in progress <br />