Drive Reconstruction assessments for 2018 payable tax year, Improvement Project #17-00. <br />Alternative #2 — Motion to deny adoption of Resolution # 17-10-252 at this time. <br />Funding Source: <br />The construction contract amount for this project is $409,385.03, which is $51,742.21 or 11.2% less than the <br />engineer's estimate of $461,127.24. <br />Final project costs totaled $507,244.26 and include; <br />• Final construction costs = $407,523.06 <br />• Bituminous base course incentive = $2,476.89 <br />• Bituminous wear course incentive = $2,393.76 <br />• Indirect costs (6% admin., 15% engineering, 1% finance, 1% legal) = $94,850.55 <br />Funding sources include a combination of Street Reconstruction and Overlay Program (SROP) bond funds, special <br />assessments to benefiting properties, and stormwater utility funds. <br />Special Assessments <br />The City's adopted Special Assessments Policy, which is attached to this case, calls for special assessments to pay <br />for 25% of eligible street reconstruction improvement costs. Final assessments as proposed total $118,940.00, <br />which equals 23.45% of eligible final project costs. <br />Special assessments are calculated using methods resulting in reasonable and equitable distribution of assessments <br />that are uniform upon the same class of properties within the assessable area. The test for determining the validity <br />of a special assessment is whether the improvement for which the assessment was levied has increased the market <br />value of the property against which the assessment was levied in at least the amount of the assessment. <br />The City's Special Assessments Policy identifies three optional methods for calculating assessments. A total of 9 <br />benefiting properties were identified along this segment of Sunwood Drive. All properties are zoned El or E2 <br />(industrial) so only two assessment methods are recommended; the "adjusted front footage" method and the "area" <br />method. <br />Staff originally considered impacts of both methods as they would be applied in the current context of the policy. <br />The adjusted front footage method resulted in less variability between assessments ($9K - $40K), while the area <br />method resulted in greater variability ($3K - $42K). Staff initially recommended using the area method since it <br />appeared to better assign benefit based on lot geometry, which seemed to make sense for this project considering <br />the significant differences in lot depths along the corridor. <br />Based on input from the City's consultant appraisal firm, Patchin, Messner, Dodd and Brumm, who prepared a <br />benefit appraisal consultation report for this project, as well as the benefit appraisal consultation reports for all <br />street reconstruction projects in Ramsey since 2015, and per input received from other cities that have assessed <br />industrial parcels for street reconstruction improvements, the adjusted front footage method was used to calculate <br />preliminary and final assessments. <br />Patchin, Messner, Dodd and Brumm calculated estimated special benefits for each assessable property. The lesser <br />of this amount versus the adjusted front foot amount was used to determine the final assessment for each property <br />as shown in the attached final assessment roll (with minor rounding for finance purposes). This is the same <br />methodology followed in the attached Feasibility Report to determine preliminary assessments. <br />All project costs are eligible for special assessments since the street was reconstructed to its pre-existing width, and <br />since the old and new pavement sections both meet 10-ton design standards. <br />As previously noted, Connexus Energy has concerns with their final assessment because the assessed property is <br />undeveloped. Staff met with Connexus Energy representatives on several occasions to discuss their assessment and <br />