My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication requirements. PERMITTEE must pay a Park Dedication Fee of $4,250.00. <br />The PERMITTEE acknowledges that these fees are estimates. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of <br />$1,020.00. The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary <br />Sewer Trunk Fee of $2,955.00. The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Water Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of <br />$5,475.00. The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />5. Sanitary Sewer Lateral Benefit Fees. The PERMITTEE is constructing its own lateral <br />service lines; therefore no sanitary sewer lateral benefit fee is due. <br />6. Water Lateral Fees. The PERMITTEE is constructing its own lateral service lines; <br />therefore no water lateral benefit fee is due. <br />7. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management <br />Fee of $4,007.00. The PERMITTEE acknowledges that these fees are estimates. The rate <br />in effect when the Plat is recorded will be collected. <br />8. Street Light Operation and Maintenance Fee. The PERMITTEE is responsible for a <br />Street Light Operation and Maintenance Fee of $294 per light. The rate in effect when <br />the Plat is recorded will be collected. <br />9. Stormwater Infiltration Fee. The Lower Rum River Watershed Management <br />Organization requires projects to infiltrate the first inch of rainfall to reduce volume <br />entering the City's regional stormwater system. The Subject Property is located <br />within a Wellhead Protection Area. Within these areas, the Minnesota Department <br />of Health does not allow infiltration. The PERMITTEE must contribute to the <br />City's regional system for infiltration to accomplish this requirement. The <br />PERMITTEE is responsible for a contribution of $6,355.00. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.